Evaluation of Pull Production Control Strategies Under Uncertainty: An Integrated Fuzzy Ahp-Topsis Approach

被引:11
|
作者
Torkabadi, Aydin M. [1 ]
Mayorga, Rene V. [1 ]
机构
[1] Univ Regina, Regina, SK, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
just-in-time manufacturing; kanban system; hybrid control policy; multi-criteria decision making; fuzzy topsis;
D O I
10.3926/jiem.2528
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose: Just-In-Time (JIT) production has continuously been considered by industrial practitioners and researchers as a leading strategy for the yet popular Lean production. Pull Production Control Policies (PPCPs) are the major enablers of JIT that locally control the level of inventory by authorizing the production in each station. Aiming to improve the PPCPs, three authorization mechanisms: Kanban, constant-work-in-process (ConWIP), and a hybrid system, are evaluated by considering uncertainty. Design/methodology/approach: Multi-Criteria Decision Making (MCDM) methods are successful in evaluating alternatives with respect to several objectives. The proposed approach of this study applies the fuzzy set theory together with an integrated Analytical Hierarchy Process (AHP) and a Technique for Order Performance by Similarity to Ideal Solution (TOPSIS) method. Findings: The study finds that hybrid Kanban-ConWIP pull production control policies have a better performance in controlling the studied multi-layer multi-stage manufacturing and assembly system. Practical implications: To examine the approach a real case from automobile electro-mechanical part production industry is studied. The production system consists of multiple levels of manufacturing, feeding a multi-stage assembly line with stochastic processing times to satisfy the changing demand. Originality/value: This study proposes the integrated Kanban-ConWIP hybrid pull control policies and implements several alternatives on a multi-stage and multi-layer manufacturing and assembly production system. An integrated Fuzzy AHP TOPSIS method is developed to evaluate the alternatives with respect to several JIT criteria.
引用
收藏
页码:161 / 184
页数:24
相关论文
共 50 条
  • [21] A fuzzy rough number-based AHP-TOPSIS for design concept evaluation under uncertain environments
    Zhu, Guo-Niu
    Hu, Jie
    Ren, Hongliang
    APPLIED SOFT COMPUTING, 2020, 91
  • [22] An Integrated Approach of Fuzzy-AHP-TOPSIS for E-commerce Evaluation
    Tran Thi Tham
    Hong-Phuc Nguyen
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2021, 20 (02): : 82 - 95
  • [23] An Interval Valued Pythagorean Fuzzy AHP-TOPSIS Integrated Model for Ergonomic Assessment of Setup Process under SMED
    Kose, Yildiz
    Civan, Hatice Nida
    Ayyildiz, Ertugrul
    Cevikcan, Emre
    SUSTAINABILITY, 2022, 14 (21)
  • [25] AN INTEGRATED FUZZY AHP AND TOPSIS MODEL FOR SUPPLIER EVALUATION
    Stevic, Zeljko
    Tanackov, Ilija
    Vasiljevic, Marko
    Novarlic, Boris
    Stojic, Gordan
    SERBIAN JOURNAL OF MANAGEMENT, 2016, 11 (01) : 15 - 27
  • [26] An Integrated Picture Fuzzy Set with TOPSIS-AHP Approach to Group Decision-Making in Policymaking under Uncertainty
    Long Cu Kim
    Hai Pham Van
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2021, 6 (06) : 1578 - 1593
  • [27] An Integrated Approach of Fuzzy AHP-TOPSIS for Multi-Criteria Decision-Making in Industrial Robot Selection
    Tran, Ngoc-Tien
    Trinh, Van-Long
    Chung, Chen-Kuei
    PROCESSES, 2024, 12 (08)
  • [28] Integrated Fuzzy AHP-TOPSIS for selecting the best plastic recycling method: A case study
    Vinodh, S.
    Prasanna, M.
    Prakash, N. Hari
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (19-20) : 4662 - 4672
  • [29] Development Path of Construction Industry Internet Platform: An AHP-TOPSIS Integrated Approach
    Li, Kang
    Duan, Tianle
    Li, Zirui
    Xiahou, Xiaer
    Zeng, Ningshuang
    Li, Qiming
    BUILDINGS, 2022, 12 (04)
  • [30] Optimizing additive manufacturing parameters for graphene-reinforced PETG impeller production: A fuzzy AHP-TOPSIS approach
    Raja, S.
    Praveenkumar, V
    Rusho, Maher Ali
    Yishak, Simon
    RESULTS IN ENGINEERING, 2024, 24