Minimizing Makespan with Start Time-Dependent Jobs in a Two-Machine Flow Shop

被引:0
|
作者
Jafari, A. A. [1 ]
Zare, H. Khademi [1 ]
Lotfi, M. M. [1 ]
Tavakkoli-Moghaddam, R. [2 ]
机构
[1] Yazd Univ, Dept Ind Engn, Fac Engn, Yazd, Iran
[2] Univ Tehran, Sch Ind Engn, Coll Engn, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2016年 / 29卷 / 06期
关键词
Linear Deteriorating Jobs; Start Time-Dependent; Flow Shop; Makespan; Branch and Bound; Heuristics;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness; therefore, there is no polynomial-time algorithm to solve it optimally in a reasonable time. So, a branch-and-bound algorithm is proposed to find the optimal solution by means of dominance rules, upper and lower bounds. Several easy heuristic procedures are also proposed to derive near-optimal solutions. To evaluate the performance of the proposed algorithms, the computational experiments are extracted based on the recent literature. Deteriorating jobs lead to an increase in the makespan of the problems; therefore, it is important to obtain the optimal or near-optimal solution. Considering the complexity of the problem, the branch-and-bound algorithm is capable of solving problems of up to 26 jobs. Additionally, the average error percentage of heuristic algorithms is less than 1.37%; therefore, the best one is recommended to obtain a near-optimal solution for large-scale problems.
引用
收藏
页码:778 / 787
页数:10
相关论文
共 50 条
  • [11] Minimizing the makespan in the two-machine no-wait flow-shop with limited machine availability
    Espinouse, ML
    Formanowicz, P
    Penz, B
    COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 37 (1-2) : 497 - 500
  • [12] Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
    Gupta, JND
    Koulamas, CP
    Kyparisis, GJ
    Potts, CN
    Strusevich, VA
    ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) : 171 - 185
  • [13] Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan
    Jatinder N.D. Gupta
    Christos P. Koulamas
    George J. Kyparisis
    Chris N. Potts
    Vitaly A. Strusevich
    Annals of Operations Research, 2004, 129 : 171 - 185
  • [14] Minimizing makespan in a two-machine no-wait flow shop with batch processing machines
    Shanthi Muthuswamy
    Mario C. Vélez-Gallego
    Jairo Maya
    Miguel Rojas-Santiago
    The International Journal of Advanced Manufacturing Technology, 2012, 63 : 281 - 290
  • [15] MINIMIZING THE MAKESPAN IN TWO-MACHINE JOB SHOP SCHEDULING PROBLEMS WITH NO MACHINE IDLE-TIME
    Hermes, Fatma
    Carlier, Jacques
    Moukrim, Aziz
    Ghedira, Khaled
    ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 89 - +
  • [16] Algorithms for minimizing the makespan in a two-machine cross-docking flow shop problem
    Romanova A.A.
    Journal of Applied and Industrial Mathematics, 2015, 9 (04) : 570 - 579
  • [17] Minimizing makespan in a two-machine no-wait flow shop with batch processing machines
    Muthuswamy, Shanthi
    Velez-Gallego, Mario C.
    Maya, Jairo
    Rojas-Santiago, Miguel
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 63 (1-4): : 281 - 290
  • [18] Minimizing the total flow time and the tardiness in a two-machine flow shop
    Lee, WC
    Wu, CC
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2001, 32 (03) : 365 - 373
  • [19] Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
    Yu, WC
    Hoogeveen, H
    Lenstra, JK
    JOURNAL OF SCHEDULING, 2004, 7 (05) : 333 - 348
  • [20] Minimizing Makespan in a Two-Machine Flow Shop with Delays and Unit-Time Operations is NP-Hard
    Wenci Yu
    Han Hoogeveen
    Jan Karel Lenstra
    Journal of Scheduling, 2004, 7 : 333 - 348