共 50 条
- [1] RELIABILITY-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH A REPLACEABLE REPAIR FACILITY MICROELECTRONICS AND RELIABILITY, 1989, 29 (02): : 145 - 150
- [2] 2-UNIT STANDBY SYSTEM WITH PROVISO FOR REST AND MAXIMUM REST MICROELECTRONICS AND RELIABILITY, 1981, 21 (04): : 573 - 579
- [3] RELIABILITY-ANALYSIS OF A 2-UNIT COLD STANDBY REDUNDANT SYSTEM WITH ADMINISTRATIVE DELAY AND NO PRIORITY IN REPAIR MICROELECTRONICS AND RELIABILITY, 1986, 26 (05): : 847 - 850
- [4] RELIABILITY-ANALYSIS OF 2-UNIT WARM STANDBY SYSTEM WITH PARTIAL FAILURE MODE AND INSPECTION TIME MICROELECTRONICS AND RELIABILITY, 1992, 32 (1-2): : 17 - 19
- [5] RELIABILITY-ANALYSIS OF A 2-UNIT COLD STANDBY REDUNDANT SYSTEM WITH 2 OPERATING MODES MICROELECTRONICS AND RELIABILITY, 1982, 22 (04): : 747 - 758
- [6] COMMENTS ON STOCHASTIC-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH PREPARATION TIME FOR REPAIR MICROELECTRONICS AND RELIABILITY, 1988, 28 (05): : 687 - 687
- [7] COST-ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH 2 TYPES OF OPERATION AND REPAIR MICROELECTRONICS AND RELIABILITY, 1985, 25 (01): : 71 - 75
- [8] GERT ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH REPAIR MICROELECTRONICS AND RELIABILITY, 1995, 35 (05): : 837 - 840
- [9] STOCHASTIC-BEHAVIOR OF A 2-UNIT COLD STANDBY SYSTEM WITH PREPARATION TIME FOR REPAIR MICROELECTRONICS AND RELIABILITY, 1989, 29 (02): : 125 - 129
- [10] PROFIT EVALUATION OF A 2 UNIT COLD STANDBY SYSTEM WITH A PROVISO OF REST MICROELECTRONICS AND RELIABILITY, 1989, 29 (05): : 705 - 709