共 50 条
- [3] USE OF INSTRUMENTATION AND OF MATHEMATICAL MODELLIZATION IN BLAST-FURNACE OPERATION REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1987, 84 (04): : 247 - 262
- [5] LOW [SI] CONTENT OPERATION OF CHIBA NO-6 BLAST-FURNACE AT KAWASAKI-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S79 - S79
- [8] System for cleaning blast-furnace gas in the blast-furnace shop at the VSZh Koshitse combine Metallurgist, 2006, 50 : 379 - 383
- [9] INSTRUMENTATION OF A BLAST-FURNACE PLANT WITH 10000 TONS PER DAY ATM MESSTECHNISCHE PRAXIS, 1975, (469): : R17 - R20