DETERMINING THE CRITICAL ELEMENTS OF JUST-IN-TIME IMPLEMENTATION

被引:105
|
作者
MEHRA, S [1 ]
INMAN, RA [1 ]
机构
[1] LOUISIANA TECH UNIV,DEPT MANAGEMENT & MKT,RUSTON,LA 71272
关键词
DECISION ANALYSIS; INVENTORY MANAGEMENT; LOGISTICS OF DISTRIBUTION; AND PRODUCTION OPERATIONS MANAGEMENT;
D O I
10.1111/j.1540-5915.1992.tb00382.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
There are a limited number of papers dealing primarily with the implementation aspect of JIT. While the literature shows almost general agreement on the critical elements of JIT implementation, few empirical studies exist to support the proposed elements. The purpose of this study is to identify the elements of JIT implementation that are required to ensure successful implementation. A number of implementation elements were identified and subsequently grouped into a hierarchical structure consisting of four broader elements. Criteria were selected as measures of the level of implementation success. Analysis revealed that only a few of the identified elements were indeed required for successful JIT implementation.
引用
收藏
页码:160 / 174
页数:15
相关论文
共 50 条
  • [1] Just-In-Time implementation project
    Universite du Quebec a, Trois-Rivieres, Trois-Rivieres, Que, Canada
    Int J Proj Manage, 3 (171-179):
  • [2] SIMULATION IN JUST-IN-TIME IMPLEMENTATION
    PARK, PS
    SIMULATION & GAMING, 1995, 26 (01) : 51 - 59
  • [3] Just-in-time implementation in South Africa
    Karle, M.P.
    FWP journal, 1988, 28 (08):
  • [4] SURVEY IDENTIFIES CRITICAL FACTORS IN SUCCESSFUL IMPLEMENTATION OF JUST-IN-TIME PURCHASING TECHNIQUES
    ANSARI, A
    INDUSTRIAL ENGINEERING, 1986, 18 (10): : 44 - &
  • [5] Design and Implementation of Java Just-in-Time Compiler
    丁宇新
    梅嘉
    程虎
    JournalofComputerScienceandTechnology, 2000, (06) : 584 - 590
  • [6] Design and implementation of Java just-in-time compiler
    Yuxin Ding
    Jia Mei
    Hu Cheng
    Journal of Computer Science and Technology, 2000, 15 : 584 - 590
  • [7] JUST-IN-TIME IMPLEMENTATION IN THE SCOTTISH ELECTRONICS INDUSTRY
    MOULD, G
    KING, M
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 1995, 95 (09) : 17 - &
  • [8] IMPLEMENTATION OF JUST-IN-TIME METHODOLOGY IN A SMALL COMPANY
    GUPTA, SM
    BRENNAN, L
    PRODUCTION PLANNING & CONTROL, 1995, 6 (04) : 358 - 364
  • [9] Critical elements in implementations of just-in-time management: empirical study of cement industry in Pakistan
    Qureshi, Muhammad Imran
    Iftikhar, Mehwish
    Bhatti, Mansoor Nazir
    Shams, Tauqeer
    Zaman, Khalid
    SPRINGERPLUS, 2013, 2 : 1 - 14
  • [10] DETERMINING THE NUMBER OF KANBANS IN MULTIITEM JUST-IN-TIME SYSTEMS
    ASKIN, RG
    MITWASI, MG
    GOLDBERG, JB
    IIE TRANSACTIONS, 1993, 25 (01) : 89 - 98