ORDERING POLICY WITH LEAD TIME

被引:37
|
作者
OSAKI, S [1 ]
机构
[1] UNIV MANCHESTER,FAC ECON & SOCIAL STUDIES,DEPT DECIS THEORY,MANCHESTER M13 9PL,LANCASHIRE,ENGLAND
关键词
D O I
10.1080/00207727708942104
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:1091 / 1095
页数:5
相关论文
共 50 条
  • [1] OPTIMAL ORDERING POLICY FOR A SPARE UNIT WITH LEAD TIME
    THOMAS, LC
    OSAKI, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1978, 2 (06) : 409 - 419
  • [2] Discrete-time spare ordering policy with lead time and discounting
    Giri, BC
    Dohi, T
    Kaio, N
    ADVANCED RELIABILITY MODELING, 2004, : 133 - 140
  • [3] A general ordering policy with number‐dependentminimal repair and random lead time
    s.‐H. Sheu
    Annals of Operations Research, 1999, 91 : 227 - 250
  • [4] THE RETAILER OPTIMAL ORDERING POLICY FOR PERISHABLE PRODUCTS WITH LEAD TIME UNRELIABLE
    Wang, Jing
    Chen, Xu
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 1177 - 1182
  • [5] OPTIMUM ORDERING POLICY UNDER RANDOM LEAD-TIME FOR EQUIPMENT WITH A SENSOR
    SUNG, CS
    KIM, CH
    IEEE TRANSACTIONS ON RELIABILITY, 1987, 36 (04) : 467 - 469
  • [6] A general ordering policy with number-dependent minimal repair and random lead time
    Sheu, SH
    ANNALS OF OPERATIONS RESEARCH, 1999, 91 (0) : 227 - 250
  • [7] Note on optimal ordering policy with different lead times and convex ordering costs
    Xu, Ningxiong
    OPTIMAL CONTROL APPLICATIONS & METHODS, 2011, 32 (03): : 369 - 376
  • [8] Optimal Integrated Ordering and Production Policy in a Supply Chain With Stochastic Lead-Time, Processing-Time, and Demand
    Song, Dong-Ping
    IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 2009, 54 (09) : 2027 - 2041
  • [9] Ordering, Pricing, and Lead-Time Quotation Under Lead-Time and Demand Uncertainty
    Wu, Zhengping
    Kazaz, Burak
    Webster, Scott
    Yang, Kum-Khiong
    PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (03) : 576 - 589
  • [10] Optimal Ordering Policy In Dual-supplier System with Unreliable Lead-time and Minimum Lot Size
    Jin, Qun
    Liu, Lei
    Wang, Zuwen
    Wang, Yuhui
    2008 INTERNATIONAL SEMINAR ON FUTURE INFORMATION TECHNOLOGY AND MANAGEMENT ENGINEERING, PROCEEDINGS, 2008, : 380 - 384