共 50 条
- [2] MOVEMENT OF METAL IN WELD POOL IN ELECTRON-BEAM WELDING WELDING PRODUCTION, 1977, 24 (03): : 1 - 3
- [3] METAL FLOW AND WELD FORMATION IN ELECTRON-BEAM WELDING AUTOMATIC WELDING USSR, 1979, 32 (12): : 1 - 3
- [4] MELTING OF THICK METAL DURING WELDING WITH A CONICAL ELECTRON-BEAM AUTOMATIC WELDING USSR, 1978, 31 (04): : 11 - 14
- [6] CONTROL OF WELD PENETRATION DEPTH BY ELECTRON-BEAM CURRENT IN ELECTRON-BEAM WELDING TRANSACTIONS OF NATIONAL RESEARCH INSTITUTE FOR METALS, 1984, 26 (04): : 297 - 304
- [7] INCREASING THE STABILITY OF WELD FORMATION IN ELECTRON-BEAM WELDING THICK TITANIUM-ALLOYS WELDING PRODUCTION, 1984, 31 (12): : 3 - 5
- [10] CALCULATION OF THE TEMPERATURE-FIELD IN THE WELD ZONE WHEN ELECTRON-BEAM WELDING THICK METALS WELDING PRODUCTION, 1982, 29 (05): : 1 - 2