OPTIMAL SEQUENCING OF 2-STAGE JOBS IN A FLEXIBLE COMPUTER-AIDED MANUFACTURING SYSTEM

被引:0
|
作者
PANISHEV, AV
VARAKIN, AS
机构
关键词
D O I
10.1007/BF01126210
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The earliest completion time scheduling problem for n two-stage jobs is considered in a flexible computer-aided manufacturing system with (1 + m) processors (n > m > 1). Each job is assigned to one of m parallel processors.
引用
收藏
页码:232 / 239
页数:8
相关论文
共 50 条