共 50 条
- [1] ENVIRONMENTAL-IMPACT OF CHURCHILL FALLS (LABRADOR) HYDROELECTRIC PROJECT - PRELIMINARY ASSESSMENT JOURNAL OF THE FISHERIES RESEARCH BOARD OF CANADA, 1975, 32 (01): : 117 - 125
- [3] CONSTRUCTION OF INCLINED PENSTOCKS AT CHURCHILL FALLS POWER-STATION, LABRADOR PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1972, 52 (NOV): : 379 - &
- [4] CONSTRUCTION OF INCLINED PENSTOCKS AT CHURCHILL-FALLS-POWER-STATION, LABRADOR PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1973, 54 (AUG): : 525 - 532
- [6] Optimal construction project planning PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1704 - 1708
- [8] Quality planning in Construction Project INTERNATIONAL CONFERENCE ON ARCHITECTURE AND CIVIL ENGINEERING (ICACE 2017), 2018, 291
- [9] Construction project safety planning ENGINEERING & PAPERMAKERS: FORMING BONDS FOR BETTER PAPERMAKING, BOOKS 1-3, 1997, : 737 - 744