PRELIMINARY MINING AND CONSTRUCTION PLANNING OF CHURCHILL FALLS PROJECT

被引:0
|
作者
SNYDER, HL
机构
来源
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
引用
收藏
页码:751 / &
相关论文
共 50 条
  • [1] ENVIRONMENTAL-IMPACT OF CHURCHILL FALLS (LABRADOR) HYDROELECTRIC PROJECT - PRELIMINARY ASSESSMENT
    DUTHIE, HC
    OSTROFSKY, ML
    JOURNAL OF THE FISHERIES RESEARCH BOARD OF CANADA, 1975, 32 (01): : 117 - 125
  • [2] CHURCHILL FALLS - COSTS AND BENEFITS OF A HYDRO-ELECTRIC DEVELOPMENT PROJECT
    CRABB, P
    GEOGRAPHY, 1973, 58 (261) : 330 - 335
  • [3] CONSTRUCTION OF INCLINED PENSTOCKS AT CHURCHILL FALLS POWER-STATION, LABRADOR
    DAWSON, HJ
    LYTTLE, RPT
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1972, 52 (NOV): : 379 - &
  • [4] CONSTRUCTION OF INCLINED PENSTOCKS AT CHURCHILL-FALLS-POWER-STATION, LABRADOR
    DAWSON, HJ
    LYTTLE, RPT
    BURDEN, JJ
    HARDING, H
    PATON, J
    MACKINTO.IB
    GOSSCHAL.EM
    PATON, TAL
    HANCOCK, PHD
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1973, 54 (AUG): : 525 - 532
  • [5] USE OF CHURCHILL FALLS
    WILLETT, DC
    ELETTROTECNICA, 1972, 59 (01): : 39 - &
  • [6] Optimal construction project planning
    AbouRizk, S
    Mohamed, Y
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1704 - 1708
  • [7] Construction project safety planning
    Szymberski, RT
    TAPPI JOURNAL, 1997, 80 (11): : 69 - 74
  • [8] Quality planning in Construction Project
    Othman, I
    Shafiq, Nasir
    Nuruddin, M. F.
    INTERNATIONAL CONFERENCE ON ARCHITECTURE AND CIVIL ENGINEERING (ICACE 2017), 2018, 291
  • [9] Construction project safety planning
    Szymberski, R
    ENGINEERING & PAPERMAKERS: FORMING BONDS FOR BETTER PAPERMAKING, BOOKS 1-3, 1997, : 737 - 744
  • [10] Construction project safety planning
    TAPPI J, 11 (69):