Grade control geological mapping in underground gold vein operations

被引:4
|
作者
Dominy, S. [1 ,2 ,3 ]
Platten, I. [4 ]
机构
[1] Snowden Min Ind Consultants Pty Ltd, POB 416W, Ballarat West, Vic 3350, Australia
[2] Curtin Univ, Western Australian Sch Mines, Perth, WA 6845, Australia
[3] Univ Ballarat, Sch Sci Informat Technol & Engn, Ballarat, Vic 3353, Australia
[4] Snowden Min Ind Consultants Ltd, Magdalen Ctr, Oxford OX4 4GA, England
关键词
Underground gold vein operations; Grade control; Geological mapping; Mine sampling;
D O I
10.1179/1743275812Y.0000000019
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Grade control is a process of maximising value and reducing risk. It requires the delivery of tonnes at an optimum grade to the mill, via the accurate definition of ore and waste. It essentially comprises data collection, integration and interpretation, local resource estimation, stope design, supervision of mining and stockpile management. The foundation of all grade control programmes should be that of geological understanding led by clear and accurate mapping and representative sampling to drive appropriate estimation strategies and mining. Gold veins show features relating to erratic grade distribution ( nugget effect), and variable geometry and internal architecture. These features include variations in dip, strike and width, late-stage faulting/shearing effects and vein continuity and type. Variations generally require close geological understanding to ensure optimum grade, minimal dilution and maximum mining recovery. A well-designed grade control programme will prove to management and stakeholders that by applying geological knowledge, the mining process can be both efficient and cost effective.
引用
收藏
页码:96 / 103
页数:8
相关论文
共 50 条
  • [1] Geological modelling and grade control in a narrow vein, high-grade gold mine
    Sims, D
    FOURTH INTERNATIONAL MINING GEOLOGY CONFERENCE, 2000, 2000 (03): : 65 - 76
  • [2] Integrating the Theory of Sampling into Underground Mine Grade Control Strategies: Case Studies from Gold Operations
    Dominy, Simon C.
    Glass, Hylke J.
    O'Connor, Louisa
    Lam, Chloe K.
    Purevgerel, Saranchimeg
    MINERALS, 2019, 9 (04):
  • [3] Grab sampling for underground gold mine grade control
    Dominy, S. C.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2010, 110 (06) : 277 - 287
  • [4] Planning nuggety vein-gold operations: Underground exploration, bulk sampling and resource reporting
    Dominy, SC
    Cuffley, BW
    Johansen, GF
    MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 45 - 50
  • [5] Cutoff Grade Optimization on Operative Decision Variables with Geological Uncertainty in an Underground Gold Mine: A Real Case Study
    Morales, Diego Alejandro Toro
    Sepulveda, Giovanni Franco
    de la Barra, Erick
    Cuervo, Juan Camilo Del Rio
    MATHEMATICS, 2024, 12 (22)
  • [6] USE OF PHOTOGRAPHY IN GEOLOGICAL UNDERGROUND DOCUMENTATION, PARTICULARLY IN VEIN DEPOSITS
    BERNSTEIN, KH
    KLEINSTAUBER, G
    SCHREIBER, A
    HARTNICK, D
    ZEITSCHRIFT FUR ANGEWANDTE GEOLOGIE, 1979, 25 (2-3): : 77 - 84
  • [7] PROMISING TECHNOLOGIES FOR UNDERGROUND MINING OF VEIN GOLD DEPOSITS
    Sokolov, I., V
    Antipin, Yu G.
    Smirnov, A. A.
    Nikitin, I., V
    PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2020, 4 : 280 - 292
  • [8] Automated Planning of Underground Mining Operations with Regard to Geological and Geotechnical Constraints
    Laptev, V. V.
    Gurin, K. P.
    JOURNAL OF MINING SCIENCE, 2023, 59 (03) : 490 - 496
  • [9] Automated Planning of Underground Mining Operations with Regard to Geological and Geotechnical Constraints
    V. V. Laptev
    K. P. Gurin
    Journal of Mining Science, 2023, 59 : 490 - 496
  • [10] The drilling operations in case of the use of underground geological technology in Ural region
    Slavikovskij, O.V.
    Osintsev, V.A.
    Izvestiya Vysshikh Uchebnykh Zavedenii, Gornyi Zhurnal, 2001, (03): : 143 - 148