A New Multi-objective Model for Multi-mode Project Planning with Risk

被引:7
|
作者
Mollaei, H. R. [1 ]
Tavakkoli-Moghaddam, R. [2 ]
Toloie-Eshlaghy, A. [1 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Ind Management, Tehran, Iran
[2] Univ Tehran, Sch Ind Engn, Coll Engn, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2018年 / 31卷 / 05期
关键词
Project Scheduling; Risk based Project Planning; Discrete Time-Cost-Quality-risk Trade-off; Evolutionary Algorithm;
D O I
10.5829/ije.2018.31.05b.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The aim of this problem is to choose a set of project activities for crashing in such a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this paper, linear relationships between time and cost, and between time and quality are omitted and the problem of the expected time-cost-quality trade-off is considered in a probabilistic and discrete state (DTCQRTP). Then, to make the problem more real, the combination of four measures are considered as uncertain for each executive mode. It means that the time, cost, quality or risk (or all of them) of each activity in each executive mode is considered as the expected numbers (probabilistic means). After modeling four-objective problems, a test problem with nine activities is presented and solved by the non-dominated sorting genetic algorithm (NSGA-II). In order to improve the results and speed of the proposed algorithm in accessing Pareto solutions, a new hybrid algorithm, called MEM-NSGA, is presented that gives better solutions than the original NSGA-II at the same conditions.
引用
收藏
页码:770 / 779
页数:10
相关论文
共 50 条
  • [1] Multi-objective optimization for the multi-mode finance-based project scheduling problem
    Sameh Al-Shihabi
    Mohammad Aldurgam
    Frontiers of Engineering Management, 2020, 7 : 223 - 237
  • [2] Multi-objective optimization for the multi-mode finance-based project scheduling problem
    Al-Shihabi, Sameh
    Aldurgam, Mohammad
    FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (02) : 223 - 237
  • [3] A Multi-Objective Project Scheduling Problem Subject to Project Reliability and Multi-Mode Activities with Time Window
    Nejad, Behnam Hosseinian
    Farughi, Hiwa
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2021, 20 (03): : 356 - 372
  • [4] A Multi-Objective Water Cycle Algorithm for the BI-Objective Multi-Mode Project Resource Renting Problem
    Mahmoodi, Samin
    Najafi, Amir Abbas
    Ghods, Kian
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2024, 58 (01): : 104 - 119
  • [5] Multi-Objective Adaptive Cruise Control with Multi-Mode Strategy
    Zhang J.-H.
    Li Q.
    Chen D.-P.
    Dianzi Keji Daxue Xuebao/Journal of the University of Electronic Science and Technology of China, 2018, 47 (03): : 368 - 375
  • [6] A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems
    Tavana, Madjid
    Abtahi, Amir-Reza
    Khalili-Damghani, Kaveh
    EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (04) : 1830 - 1846
  • [7] Bi-Objective Multi-Mode Project Scheduling Under Risk Aversion
    Gutjahr, Walter J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) : 421 - 434
  • [8] Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
    Tirkolaee, Erfan Babaee
    Goli, Alireza
    Hematian, Milad
    Sangaiah, Arun Kumar
    Han, Tao
    COMPUTING, 2019, 101 (06) : 547 - 570
  • [9] Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
    Erfan Babaee Tirkolaee
    Alireza Goli
    Milad Hematian
    Arun Kumar Sangaiah
    Tao Han
    Computing, 2019, 101 : 547 - 570
  • [10] A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem
    Maghsoudlou, Hamidreza
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    COMPUTERS & CHEMICAL ENGINEERING, 2016, 88 : 157 - 169