CONSTRUCTION RISK ASSESSMENT BY LINGUISTICS

被引:153
作者
KANGARI, R [1 ]
RIGGS, LS [1 ]
机构
[1] GEORGIA INST TECHNOL,SCH ENGN,ATLANTA,GA 30332
关键词
D O I
10.1109/17.18829
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:126 / 131
页数:6
相关论文
共 26 条
[1]   PROJECT SCHEDULING USING FUZZY SET CONCEPTS [J].
AYYUB, BM ;
HALDAR, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1984, 110 (02) :189-204
[2]  
BENJAMIN NB, 1971, OCT P ASCE ANN NAT E
[3]  
BONISSONE PP, 1979, P INT C CYBERN SOC D
[4]  
BROWNELL HH, 1978, MEM COGNITION, V6, P481, DOI 10.3758/BF03198235
[5]  
CARROL JM, 1984, MANAGING RISK COMPUT
[6]  
CLEMENTS DP, 1971, THESIS U CALIFORNIA
[7]  
Covello Vincent T., 1986, RISK EVALUATION MANA
[8]  
Dubois, 1980, FUZZY SETS FUZZY SYS
[9]   FUZZY-SETS, SUBJECTIVE MEASUREMENTS AND UTILITY [J].
FRANKSEN, OI .
INTERNATIONAL JOURNAL OF MAN-MACHINE STUDIES, 1979, 11 (04) :521-545
[10]  
GUPTA MM, 1982, FUZZY INFORMAL DECIS