A multi-period mixed integer programming model for the problem of relocating a global manufacturing facility

被引:2
|
作者
Zhang, Abraham [1 ]
Huang, George Q. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Pokfulam Rd, Hong Kong, Hong Kong, Peoples R China
关键词
facility relocation; global manufacturing; supply chain management; mixed integer programming; Pearl River Delta;
D O I
10.1080/10170669.2010.512772
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the recent years, changing business conditions have triggered labor-intensive global manufacturers to consider relocating out of the Pearl River Delta of China, known as "The World's Factory.'' This article presents a multi-period mixed integer programming model for the problem of relocating a global manufacturing facility. The objective function of the model is to maximize total after-tax profit. The model addresses dynamic aspects of timing, including potential developments in business factors and the need for a gradual capacity transfer in order not to disrupt supply chain activities. The model application generates an optimal capacity transfer schedule and forecasts after-tax profits. In general, a stable exchange rate for the Chinese currency, renminbi (RMB), would make lower-cost areas of China more competitive. Also, a dramatic RMB appreciation would enhance the comparative advantage of Asian lower-cost countries. A rapid increase in oil prices would make locations near major markets more favorable in order to avoid high transportation costs.
引用
收藏
页码:407 / 417
页数:11
相关论文
共 50 条
  • [1] A multi-period mixed integer programming model on reconfigurable manufacturing cells
    Kataoka, Takayuki
    SUSTAINABLE MANUFACTURING - HAND IN HAND TO SUSTAINABILITY ON GLOBE, 2020, 43 : 231 - 238
  • [2] A multi-period mixed integer linear programming model for water and energy supply planning in Kuwait
    Nael AlQattan
    Mark Ross
    Aydin K. Sunol
    Clean Technologies and Environmental Policy, 2015, 17 : 485 - 499
  • [3] A multi-period mixed integer linear programming model for water and energy supply planning in Kuwait
    AlQattan, Nael
    Ross, Mark
    Sunol, Aydin K.
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2015, 17 (02) : 485 - 499
  • [4] An industrial application using mixed-integer programming technique: A multi-period utility system model
    Hui, CW
    Natori, Y
    COMPUTERS & CHEMICAL ENGINEERING, 1996, 20 : S1577 - S1582
  • [5] A new mixed integer linear programming model for the multi level uncapacitated facility location problem
    Kratica, Jozef
    Dugosija, Djordje
    Savic, Aleksandar
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (7-8) : 2118 - 2129
  • [6] Facility Location Problem for Reconfigurable Manufacturing System with Changing Multi-Period Demand
    Jeong, Donghwa
    Seo, Yoonho
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1009 - 1012
  • [7] Multi-Period Optimization of Hybrid Energy Systems Using Mixed Integer Linear Programming
    Alhashedi, Salah
    Khan, Khalid A.
    Alowaifeer, Maad
    Khalid, Muhammad
    2023 IEEE IAS GLOBAL CONFERENCE ON RENEWABLE ENERGY AND HYDROGEN TECHNOLOGIES, GLOBCONHT, 2023,
  • [8] A multi-period multiple parts mixed integer linear programming model for AM adoption in the spare parts supply Chain
    Mecheter, Asma
    Pokharel, Shaligram
    Tarlochan, Faris
    Tsumori, Fujio
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2024, 37 (05) : 550 - 571
  • [9] Solving multi-period facility location problem with heuristics
    Hormozi, AM
    Khumawala, BM
    DECISION SCIENCES INSTITUTE 1998 PROCEEDINGS, VOLS 1-3, 1998, : 1026 - 1028
  • [10] The multi-period incremental service facility location problem
    Albareda-Sambola, Maria
    Fernandez, Elena
    Hinojosa, Yolanda
    Puerto, Justo
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (05) : 1356 - 1375