AN IMPROVED VERSION OF THE PRODUCTION SWITCHING HEURISTIC FOR THE AGGREGATE PRODUCTION PLANNING PROBLEM

被引:7
|
作者
HWANG, H
CHA, CN
机构
[1] Department of Industrial Engineering, Korea Advanced Institute of Science and Technology, Yusong-gu, Taejon, 305-701
[2] Hyundai Electronics Industries Co, Kyongki-do, 467-860, Ichon-kun
关键词
D O I
10.1080/00207549508904832
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The production switching heuristic (PSH) is recognized as an effective solution method for the aggregate production planning problem in industries where production is limited to discrete levels. However, we find that the PSH is not sufficiently responsive to demand fluctuation and tends to make belated decisions. This shortcoming stems mainly from the switching mechanism. This paper proposes an improved version of the PSH. The heuristic uses an improved switching mechanism which can be shown to dominate the PSH. The effectiveness of the proposed heuristic is investigated with several well known problems including the paint factory problem. The results are compared with those of the linear decision rule and the linear programming model as well as the PSH.
引用
收藏
页码:2567 / 2577
页数:11
相关论文
共 50 条
  • [1] PRODUCTION SWITCHING HEURISTICS FOR AGGREGATE PLANNING PROBLEM
    MELLICHAMP, JM
    LOVE, RM
    MANAGEMENT SCIENCE, 1978, 24 (12) : 1242 - 1251
  • [2] Experimental comparison of the switching heuristics for aggregate production planning problem
    Hyundai Electronics Industries Co, Kyongki-do, Korea, Republic of
    Comput Ind Eng, 3-4 (625-630):
  • [3] Experimental comparison of the switching heuristics for aggregate production planning problem
    Cha, CN
    Hwang, H
    COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (3-4) : 625 - 630
  • [5] MODIFIED PRODUCTION SWITCHING HEURISTICS FOR AGGREGATE PRODUCTION PLANNING
    NAM, SJ
    LOGENDRAN, R
    COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (05) : 531 - 541
  • [6] A DISCRETE PRODUCTION SWITCHING RULE FOR AGGREGATE PLANNING
    OLIFF, MD
    LEONG, GK
    DECISION SCIENCES, 1987, 18 (04) : 582 - 597
  • [7] A comment on the formulation of an aggregate production planning problem
    Phruksaphanrat, Busaba
    Ohsato, Ario
    Yenradee, Pisal
    2006 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2006, : 262 - 267
  • [8] Improved heuristic methods for multiple stage production planning
    Simpson, Natalie C.
    Erenguc, S.Selcuk
    Computers and Operations Research, 1998, 25 (7-8): : 611 - 623
  • [9] Improved heuristic methods for multiple stage production planning
    Simpson, NC
    Erenguc, SS
    COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (7-8) : 611 - 623
  • [10] An Improved Heuristic Algorithm for the Order Planning of Steelmaking Production
    Sun, Liangliang
    Li, Sisi
    Qi, Yuanwei
    Ma, Tianmu
    PROCEEDINGS OF 2017 CHINESE INTELLIGENT AUTOMATION CONFERENCE, 2018, 458 : 131 - 141