Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine

被引:0
|
作者
Morshedlou, A. [1 ]
Dehghani, H. [2 ]
Hoseinie, S. H. [2 ]
机构
[1] Hamedan Univ Technol, Dept Min Engn, Hamadan, Iran
[2] Lulea Univ Technol, Div Operat & Maintenance Engn, Lulea, Sweden
来源
JOURNAL OF MINING AND ENVIRONMENT | 2014年 / 5卷 / 02期
关键词
Powered Support; Reliability; Failure; Maintenance;
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Utilizing the gathered failure data and failure interval data from Tabas coal mine in two years, this paper discusses the reliability of powered supports. The data sets were investigated using statistical procedures and in two levels: the existence of trend and serial correlation. The results show that the powered supports follow the Gamma reliability function. The reliability of the machine decreases to almost zero after 520 operation hours and after 80 hours the probability of failure of powered supports increases to 60 percent. The failure rate of powered support shows an improving behavior and therefore a decreasing failure rate. In the beginning of the process, the failure rate is 0.021 failures per hour. This reaches the rate of 0.012 after a sudden decrease, thence forward on a gently decreasing rate and after 100 hours gets to the rate of 0.01. Regarding the maintenance policy and to protect the machine's operation continuity, preventive maintenance strategy can be chosen. The reliability of the discussed machine can be maintained on a descent level by inspecting and controlling the parts in short term intervals. With regard to reliability plots of powered supports operation, preventive reliability-based maintenance time intervals for 80% reliability levels for powered supports is 15 hours.
引用
收藏
页码:113 / 120
页数:8
相关论文
共 50 条
  • [1] Discontinuous Modeling of Roof Strata Caving in a Mechanized Longwall Mine in Tabas Coal Mine
    Arasteh, Hossein
    Esmaeili, Kamran
    Saeedi, Gholamreza
    Farsangi, Mohammad Ali Ebrahimi
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2022, 22 (05)
  • [2] Investigating the shape and size distribution of dust in mechanized longwall method in Tabas coal mine
    Arasteh, Hossein
    Saeedi, Gholamreza
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2017, 23 (01): : 28 - 39
  • [3] Estimation of reliability-based maintenance time intervals of Load-Haul-Dumper in an underground coal mine
    Balaraju, J.
    Raj, M. Govinda
    Murthy, C. H. S. N.
    JOURNAL OF MINING AND ENVIRONMENT, 2018, 9 (03): : 761 - 770
  • [4] Support Analysis of Main Tunnels in Tabas Mechanized Parvadeh Mine at Intersection with Coal Seam
    Abbasi, Fazel
    Khosravi, Mohammad Hossein
    Jafari, Ahmad
    Bashari, Ali
    Alipenhani, Behnam
    JOURNAL OF MINING AND ENVIRONMENT, 2021, 12 (03): : 711 - 724
  • [5] Reliability-based maintenance and job scheduling for identical parallel machines
    Jamshidi, R.
    Esfahani, Mir Mehdi Seyyed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1216 - 1227
  • [6] Reliability-based optimization of maintenance scheduling of mechanical components under fatigue
    Beaurepaire, P.
    Valdebenito, M. A.
    Schueller, G. I.
    Jensen, H. A.
    COMPUTER METHODS IN APPLIED MECHANICS AND ENGINEERING, 2012, 221 : 24 - 40
  • [7] Reliability-based maintenance scheduling of hydraulic system of rotary drilling machines
    Rahimdel, Mohammad Javad
    Ataei, Mohammad
    Khalokakaei, Reza
    Hoseinie, Seyed Hadi
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2013, 23 (05) : 771 - 775
  • [8] Reliability-based maintenance scheduling of generating units in restructured power systems
    Fotuhi-Firuzabad, Mahmud
    Aminifar, Farrokh
    Shahzadeh, Abbas
    TURKISH JOURNAL OF ELECTRICAL ENGINEERING AND COMPUTER SCIENCES, 2014, 22 (05) : 1147 - 1158
  • [9] Reliability-based optimal maintenance scheduling by considering maintenance effect effect to reduce cost
    Zhang, T
    Nakamura, M
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2005, 21 (02) : 203 - 220
  • [10] Reliability-based maintenance scheduling of hydraulic system of rotary drilling machines
    Mohammad Javad Rahimdel
    Mohammad Ataei
    Reza Khalokakaei
    Seyed Hadi Hoseinie
    International Journal of Mining Science and Technology, 2013, 23 (05) : 771 - 775