On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures

被引:115
|
作者
Durdyev, Serdar [1 ]
Mbachu, Jasper [1 ]
机构
[1] Massey Univ, Wellington, New Zealand
来源
CONSTRUCTION ECONOMICS AND BUILDING | 2011年 / 11卷 / 03期
关键词
Construction management; Labour productivity; New Zealand construction industry; Performance improvement; Productivity constraints;
D O I
10.5130/AJCEB.v11i3.2120
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Productivity is key to the survival and growth of any organisation, industry or nation. Some factors constrain the achievement of the set project objectives in the New Zealand building and construction industry and are responsible for the reported steady decline of productivity and performance. This study aims to identify the key constraints to on-site labour productivity and improvement measures. Using the descriptive survey method, views of some project managers, contractors and subcontractors in New Zealand were canvassed via pilot interviews and questionnaire surveys at the qualitative and quantitative data gathering stages, respectively. Multi-attribute technique was used to analyse the quantitative data. Results showed that the key external constraints to on-site labour productivity comprise, in order of decreasing impact, statutory compliance, unforeseen events and wider external dynamics. The internal constraints were found to have much higher impact on onsite productivity than the external factors. In order of diminishing levels of impact, the internal constraints comprise reworks, level of skill and experience of the workforce, adequacy of method of construction, buildability issues, and inadequate supervision and coordination.. The factors underlying each broad category of external and internal constraints are reported. The relative levels of impact of the identified constraints are expected to guide the project team in addressing the constraints in a cost-effective manner.
引用
收藏
页码:18 / 33
页数:16
相关论文
共 50 条
  • [1] Labour Productivity in the New Zealand Construction Industry: A Thorough Investigation
    Tran, Van
    Tookey, John
    CONSTRUCTION ECONOMICS AND BUILDING, 2011, 11 (01): : 41 - 60
  • [2] Monitoring on-site construction productivity
    Lemon, K.
    Christian, J.
    Proceedings - Annual Conference and 1st Biennial Environmental Speciality Conference, 1990, 2 pt 1
  • [3] A Review of Productivity Analysis of the New Zealand Construction Industry
    Abbott, Malcolm
    Carson, Chris
    CONSTRUCTION ECONOMICS AND BUILDING, 2012, 12 (03): : 1 - 15
  • [4] PRODUCTIVITY AS A DETERMINANT OF LABOUR WAGE IN NEW ZEALAND'S CONSTRUCTION SECTOR
    Ozturk, Mustafa
    Durdyev, Serdar
    Aras, Osman Nuri
    Banaitis, Audrius
    TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2019, 25 (05) : 900 - 914
  • [5] Education and labour productivity in New Zealand
    Razzak, W. A.
    Timmins, J.
    APPLIED ECONOMICS LETTERS, 2010, 17 (02) : 169 - 173
  • [6] On-site construction productivity in Malaysian infrastructure projects
    Durdyev, Serdar
    Ismail, Syuhaida
    STRUCTURAL SURVEY, 2016, 34 (4-5) : 446 - 462
  • [7] Review of digital technologies to improve productivity of New Zealand construction industry
    Chowdhury T.
    Adafin J.
    Wilkinson S.
    Journal of Information Technology in Construction, 2019, 24 : 569 - 587
  • [8] A Comparative Approach to Determining the Growth of Productivity of the New Zealand Construction Industry
    Abbott, Malcolm
    Carson, Chris
    CONSTRUCTION ECONOMICS AND BUILDING, 2013, 13 (04): : 65 - 77
  • [9] REVIEW OF DIGITAL TECHNOLOGIES TO IMPROVE PRODUCTIVITY OF NEW ZEALAND CONSTRUCTION INDUSTRY
    Chowdhury, Tabinda
    Adafin, Johnson
    Wilkinson, Suzanne
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2019, 24 : 569 - 587
  • [10] Productivity improvement in the Indonesian construction industry
    Arditi, David
    Mochtar, Krishna
    Construction Management and Economics, 1996, 14 (01): : 13 - 24