共 26 条
- [2] BLAST-FURNACE OPERATION WITH HIGH PRODUCTIVITY AT KIMITSU NO-2 BLAST-FURNACE OF NIPPON-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (12): : S796 - S796
- [3] HIGH PELLETS RATIO OPERATION AT KAKOGAWA NO-2 BLAST-FURNACE TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1992, 78 (08): : 1322 - 1329
- [4] OPERATION UTILIZING THE BELL-LESS TOP OF NO-2 BLAST-FURNACE AT FUKUYAMA-WORKS, NIPPON TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (12): : S775 - S775
- [5] PRODUCTION TRIALS WITH A FERROUS BURDEN OF 100-PERCENT PELLETS AT BLAST-FURNACE NO-6 IN IJMUIDEN STAHL UND EISEN, 1995, 115 (06): : 47 - 53
- [7] LOW COKE RATE OPERATION AT THE KOBE STEEL KAKOGAWA NO-2 BLAST-FURNACE REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1991, 88 (04): : 345 - 352
- [8] 0-PERCENT SINTER RATIO OPERATION OF WAKAYAMA NO-2 BLAST-FURNACE, SUMITOMO-METAL-INDUSTRIES-LTD TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S874 - S874
- [9] BLAST-FURNACE OPERATION WITH LOW-SILICON PIG-IRON AT MIZUSHIMA NO-2 BLAST-FURNACE, KAWASAKI-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S80 - S80
- [10] COAL POWDER INJECTION IN A BLAST-FURNACE WITH 100-PERCENT OLIVINE PELLETS BURDEN - A DESCRIPTION OF AN APPLIED-RESEARCH PROJECT TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (08): : 1070 - 1070