共 50 条
- [1] PLANNING AND DESIGN OF HONG-KONG MASS TRANSIT RAILWAY PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1976, 60 (AUG): : 535 - 545
- [2] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1982, 72 (FEB): : 87 - 98
- [3] DESIGN AND CONSTRUCTION OF SOME UNDERGROUND STATIONS FOR THE HONG-KONG MASS TRANSIT RAILWAY SYSTEM STRUCTURAL ENGINEER-PART A, 1979, 57 (07): : 231 - 237
- [4] DESIGN AND CONSTRUCTION OF SOME UNDERGROUND STATIONS FOR HONG-KONG MASS TRANSIT RAILWAY SYSTEM STRUCTURAL ENGINEER-PART A, 1978, 56 (01): : 11 - 20
- [5] THE ELECTRIC MULTIPLE UNIT TRAINS OF THE HONG-KONG MASS TRANSIT RAILWAY CORPORATION PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS, 1981, 195 (DEC): : 397 - 407
- [7] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF THE DRIVEN TUNNELS AND THE IMMERSED TUBE PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 627 - 655
- [9] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF ABOVE-GROUND WORKS AND TRACKWORK PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 657 - 688
- [10] PROGRESS OF HONG-KONG MASS TRANSIT METRO CONFOUNDS CRITICS ELECTRICAL REVIEW, 1977, 201 (23): : 61 - &