A dynamic multi-agent-based scheduling approach for SMEs

被引:0
|
作者
Ali Vatankhah Barenji
Reza Vatankhah Barenji
Danial Roudi
Majid Hashemipour
机构
[1] Eastern Mediterranean University,Department of Mechanical Engineering
[2] Hacettepe University,Department of Industrial Engineering
关键词
Multi-agent system; Dynamic scheduling; Flow-line manufacturing; Prometheus methodology; JACK platform;
D O I
暂无
中图分类号
学科分类号
摘要
In modern manufacturing systems with computational complexities, decision-making with respect to dynamic rescheduling and reconfiguration in case of internal disturbances is an important issue. This paper introduces a multi-agent-based dynamic scheduling system for manufacturing flow lines (MFLs) using the Prometheus methodology (PM) considering the dynamic customer demands and internal disturbances. The PM is used for designing a decision-making system with the feature of simultaneous dynamic rescheduling. The developed system is implemented on a real MFL of a small- and medium-sized enterprise (unplasticized polyvinyl chloride (uPVC) door and window) where the dynamic customer demands and internal machine break downs are considered. The application has been completely modeled using a Prometheus design tool, which offers full support to the PM, and implemented in JACK agent-based systems. Each agent is autonomous and has an ability to cooperate and negotiate with other agents. The proposed decision-making system supports both static and dynamic scheduling. A simulation platform for testing the proposed multi-agent system (MAS) is developed, and two real scenarios are defined for evaluating the proposed system. The analysis takes into account the comparisons of the overall performances of the system models using the MAS scheduling and conventional scheduling approaches. The result of simulation indicates that the proposed MAS could increase the uptime productivity and the production rate of flexible flow-line manufacturing systems.
引用
收藏
页码:3123 / 3137
页数:14
相关论文
共 50 条
  • [1] A dynamic multi-agent-based scheduling approach for SMEs
    Barenji, Ali Vatankhah
    Barenji, Reza Vatankhah
    Roudi, Danial
    Hashemipour, Majid
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 89 (9-12): : 3123 - 3137
  • [2] Research on multi-agent-based scheduling approach for job scheduling
    Rao, Yunqing
    Xie, Chang
    Li, Shuxia
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2004, 15 (10):
  • [3] Multi-agent-based approach for meeting scheduling system
    Kawamura, Takao
    Hamada, Yusuke
    Sugahara, Kazunori
    Kagemoto, Kengo
    Motomura, Shinichi
    2007 INTERNATIONAL CONFERENCE ON INTEGRATION OF KNOWLEDGE INTENSIVE MULTI-AGENT SYSTEMS, 2007, : 79 - +
  • [4] Multi-agent-based agile scheduling
    Rabelo, EJ
    Camarinha-Matos, LM
    Afsarmanesh, H
    ROBOTICS AND AUTONOMOUS SYSTEMS, 1999, 27 (1-2) : 15 - 28
  • [5] Multi-agent-based intelligent scheduling
    Fu, X.
    Li, Z.
    Huazhong Ligong Daxue Xuebao/Journal Huazhong (Central China) University of Science and Technology, 2001, 29 (10): : 99 - 101
  • [6] A multi-agent-based approach for personnel scheduling in assembly centers
    Sabar, M.
    Montreuil, B.
    Frayret, J. -M.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2009, 22 (07) : 1080 - 1088
  • [7] Multi-agent-based scheduling in cloud manufacturing with dynamic task arrivals
    Liu, Yongkui
    Wang, Lihui
    Wang, Yuquan
    Wang, Xi Vincent
    Zhang, Lin
    51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 953 - 960
  • [8] Multi-agent-based dynamic scheduling method for semiconductor wafer fabrication facilities
    College of Electronics and Information Engineering, Tongji University, Shanghai 200092, China
    Qinghua Daxue Xuebao, 2007, SUPPL. 2 (1895-1898):
  • [9] The Fabricare system: a multi-agent-based scheduling prototype
    Sousa, P
    Ramos, C
    Neves, J
    PRODUCTION PLANNING & CONTROL, 2004, 15 (02) : 156 - 165
  • [10] Multi-agent-based fuzzy scheduling for shop floor
    Li, Ying
    Zheng, Jia-Qiang
    Yang, Shan-Lin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 689 - 695