Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm

被引:0
|
作者
Wenjie Wang
Guangdong Tian
Gang Yuan
Duc Truong Pham
机构
[1] Shandong University,Key Laboratory of High Efficiency and Clean Mechanical Manufacture (Ministry of Education), National Demonstration Center for Experimental Mechanical Engineering Education, School of Mechanical Engineering
[2] Zhejiang University,State Key Laboratory of Fluid Power and Mechatronic Systems
[3] Jilin University,College of Biological and Agricultural Engineering
[4] National University of Singapore,Department of Industrial Systems Engineering and Management
[5] University of Birmingham,College of Mechanical Engineering
来源
关键词
Remanufacturing system; Disassembly; Shop scheduling; Energy consumption; Multi-objective invasive weed optimization;
D O I
暂无
中图分类号
学科分类号
摘要
This article studies the scheduling problem for a remanufacturing system with parallel disassembly workstations, parallel flow-shop-type reprocessing lines and parallel reassembly workstations. The problem is formulated as a multi-objective optimization problem which contains both energy consumption and makespan to be addressed using an improved multi-objective invasive weed optimization (MOIWO) algorithm. Two vectors regarding workstation assignment and operation scheduling jointly form a solution. A hybrid initialization strategy is utilized to improve the solution quality and the Sigma method is adopted to rate each solution. A novel seed spatial dispersal mechanism is introduced and four designed mutation operations cooperate to enhance search ability. A group of numerical experiments and a practical case involving the disassembly of transmission devices are carried out and the results validate the effectiveness of the MOIWO algorithm for the considered problem compared with existing methods.
引用
收藏
页码:1065 / 1083
页数:18
相关论文
共 50 条
  • [1] Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm
    Wang, Wenjie
    Tian, Guangdong
    Yuan, Gang
    Pham, Duc Truong
    JOURNAL OF INTELLIGENT MANUFACTURING, 2023, 34 (03) : 1065 - 1083
  • [2] An optimization algorithm for integrated remanufacturing production planning and scheduling system
    Wen, Haijun
    Hou, Shiwang
    Liu, Zhaohua
    Liu, Yongjiang
    CHAOS SOLITONS & FRACTALS, 2017, 105 : 69 - 76
  • [3] A recommender system based on invasive weed optimization algorithm
    Rad, Hoda Sepehri
    Lucas, Caro
    2007 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-10, PROCEEDINGS, 2007, : 4297 - +
  • [4] A DAG Task Scheduling Scheme on Heterogeneous Computing Systems Using Invasive Weed Optimization Algorithm
    Li, Kenli
    Li, Shuai
    Xu, Yuming
    Xie, Zhaoxin
    2014 SIXTH INTERNATIONAL SYMPOSIUM ON PARALLEL ARCHITECTURES, ALGORITHMS AND PROGRAMMING (PAAP), 2014, : 262 - 267
  • [5] Hybrid Invasive Weed Optimization with Tabu Search Algorithm for an Energy and Deadline Aware Scheduling in Cloud Computing
    Venuthurumilli, Pradeep
    Mandapati, Sridhar
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2020, 11 (12) : 415 - 422
  • [6] Hybrid Invasive Weed Optimization with Tabu Search Algorithm for an Energy and Deadline Aware Scheduling in Cloud Computing
    Venuthurumilli P.
    Mandapati S.
    1600, Science and Information Organization (11): : 415 - 422
  • [7] Tuning FPID Controller for an AVR System Using Invasive Weed Optimization Algorithm
    Alawad, Nasir Ahmad
    Rahman, Nora Ghani
    JORDAN JOURNAL OF ELECTRICAL ENGINEERING, 2020, 6 (02): : 128 - 139
  • [8] Invasive weed optimization algorithm for optimization no-idle flow shop scheduling problem
    Zhou, Yongquan
    Chen, Huan
    Zhou, Guo
    NEUROCOMPUTING, 2014, 137 : 285 - 292
  • [9] An effective invasive weed optimization algorithm for scheduling semiconductor final testing problem
    Sang, Hong-Yan
    Duan, Pei-Yong
    Li, Jun-Qing
    SWARM AND EVOLUTIONARY COMPUTATION, 2018, 38 : 42 - 53
  • [10] An effective invasive weed optimization algorithm for the flow shop scheduling with intermediate buffers
    Sang, Hong-yan
    Pan, Quan-ke
    2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 861 - 864