An integrated approach for prioritizing the strategic objectives of balanced scorecard under uncertainty

被引:0
|
作者
Farzad Firouzi Jahantigh
Behnam Malmir
Behzad Aslani Avilaq
机构
[1] University of Sistan and Baluchestan,Department of Industrial Engineering
[2] Kansas State University,Department of Industrial and Manufacturing Systems Engineering
[3] Istanbul Technical University,Department of Management Engineering
来源
关键词
Strategic objectives; Balanced scorecard; Grey systems theory; Strategic plan;
D O I
暂无
中图分类号
学科分类号
摘要
Successful managers are always trying to identify and prioritize strategic objectives which are the basis of each strategic plan in organizations. Strategic objectives distinguish weakness and strength keys for each strategic plan in order to define specific expectations to gain the most succeed and findings for their organization in the future. Due to the ambiguity in the judgment of managers’ prioritizing strategic objectives, this study is conducted to assist managers and prioritize the objectives. To this end, an integrated method is presented by combination of focus-group interviews as qualitative methods and grey system theory as quantitative methods. In order to examine the proposed method, a case study took into account to prioritize strategic objectives of a strategic procurement system in an Iranian company and the proposed method applied on it. The findings revealed that this method is a reliable method and showed acceptable results.
引用
收藏
页码:227 / 236
页数:9
相关论文
共 50 条
  • [1] An integrated approach for prioritizing the strategic objectives of balanced scorecard under uncertainty
    Jahantigh, Farzad Firouzi
    Malmir, Behnam
    Avilaq, Behzad Aslani
    NEURAL COMPUTING & APPLICATIONS, 2018, 29 (06): : 227 - 236
  • [2] Imbalance in the balanced scorecard: Prioritizing multiple objectives
    Thorsfeldt, DR
    Digman, LA
    DECISION SCIENCES INSTITUTE 1998 PROCEEDINGS, VOLS 1-3, 1998, : 526 - 528
  • [3] Balanced performance assessment under uncertainty: an integrated CSW-DEA and balanced scorecard (BSC)
    Mahmoudabadi, Mohammad Zarei
    Emrouznejad, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 341 (01) : 539 - 554
  • [4] Optimising design objectives using the Balanced Scorecard approach
    Wong, Franky W. H.
    Lam, Patrick T. I.
    Chan, Edwin H. W.
    DESIGN STUDIES, 2009, 30 (04) : 369 - 392
  • [5] A DEMATEL-based method for prioritizing strategic projects using the perspectives of the Balanced Scorecard
    Quezada, Luis E.
    Lopez-Ospina, Hector A.
    Ortiz, Cesar
    Oddershede, Astrid M.
    Palominos, Pedro I.
    Jofre, Paulina A.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2022, 249
  • [6] A DEMATEL-based method for prioritizing strategic projects using the perspectives of the Balanced Scorecard
    Quezada, Luis E.
    López-Ospina, Héctor A.
    Ortiz, César
    Oddershede, Astrid M.
    Palominos, Pedro I.
    Jofré, Paulina A.
    International Journal of Production Economics, 2022, 249
  • [7] Managing strategic uncertainty The diversity and use of performance measures in the balanced scorecard
    Cheng, Mandy M.
    Humphreys, Kerry A.
    MANAGERIAL AUDITING JOURNAL, 2016, 31 (4-5) : 512 - 534
  • [8] Contributions resulting from the implementation of the Balanced Scorecard for the achievement of strategic objectives: a case study
    Fagundes, Ernando
    Wiggers, Helia Madeira
    Innocenti, Renicia Maria
    Petri, Sergio Murilo
    NAVUS-REVISTA DE GESTAO E TECNOLOGIA, 2018, 8 (03): : 137 - 151
  • [9] The Balanced Scorecard of acute settings: development process, definition of 20 strategic objectives and implementation
    Groene, Oliver
    Brandt, Elimer
    Schmidt, Werner
    Moeller, Johannes
    INTERNATIONAL JOURNAL FOR QUALITY IN HEALTH CARE, 2009, 21 (04) : 259 - 271
  • [10] Implementing the balanced scorecard to achieve strategic management objectives: The case of the small engineering consultancy
    Spivey, W. Austin
    Munson, J. Michael
    King, Alberto
    PICMET '07: PORTLAND INTERNATIONAL CENTER FOR MANAGEMENT OF ENGINEERING AND TECHNOLOGY, VOLS 1-6, PROCEEDINGS: MANAGEMENT OF CONVERGING TECHNOLOGIES, 2007, : 119 - 124