共 50 条
- [2] STRESS STATE SIMULATION OF INTERCHAMBER PILLARS OF ARTEMIVSK SALT DEPOSITS MINING OF MINERAL DEPOSITS, 2015, 9 (03): : 363 - 366
- [6] EFFECT OF A WORKED-OUT ORE DEPOSIT ON THE STRESSED STATE AND STRENGTH OF INTERCHAMBER PILLARS SOVIET MINING SCIENCE USSR, 1989, 25 (02): : 117 - 124
- [7] PHYSICAL MODELING OF INTERCHAMBER PILLARS FIXITY IN GUBKIN MINE JOURNAL OF MINING INSTITUTE, 2014, 207 : 17 - 21
- [8] THE METHOD OF POTASH SALT INTERCHAMBER PILLARS STABILITY CONTROL JOURNAL OF MINING INSTITUTE, 2012, 198 : 186 - 190
- [9] THE METHOD OF POTASH SALT INTERCHAMBER PILLARS STABILITY CONTROL JOURNAL OF MINING INSTITUTE, 2013, 205 : 134 - 138