Using engineering change forecast to prioritise component modularisation

被引:0
|
作者
Edwin C. Y. Koh
Armin Förg
Matthias Kreimeyer
Markus Lienkamp
机构
[1] National University of Singapore,Engineering Design and Innovation Centre, Faculty of Engineering
[2] Technische Universität München,Institute of Automotive Technology
[3] MAN Truck & Bus AG,undefined
来源
关键词
Engineering change forecast; Change propagation; Modularisation; Design Structure Matrix (DSM); Domain Mapping Matrix (DMM);
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents a method that uses engineering change forecast to identify and prioritise product components for modularisation. The method uses a matrix-based technique to map change requirements to affected product components and later converts the said matrix into a component dependency matrix referred to in this work as the Engineering Change Forecast (ECF) matrix. The risk of change for each component is subsequently computed based on the ECF matrix to prioritise components for modularisation. The method was applied to support modularisation efforts pertaining to the design of a truck at a multinational engineering firm based in Germany. Six hundred and forty-three change requirements were considered in this work. As a comparison study, an analysis was made at the component level and repeated at the sub-component level. It was found that out of the top ten sub-components that were ranked with high modularisation priority, nine are sub-components of the top three components prioritised for modularisation when the analysis was done at the component level. This suggests that the method can produce consistent results over different levels of modelling granularity.
引用
收藏
页码:337 / 353
页数:16
相关论文
共 50 条
  • [1] Using engineering change forecast to prioritise component modularisation
    Koh, Edwin C. Y.
    Foerg, Armin
    Kreimeyer, Matthias
    Lienkamp, Markus
    RESEARCH IN ENGINEERING DESIGN, 2015, 26 (04) : 337 - 353
  • [2] CAN CHANGE PREDICTION HELP PRIORITISE REDESIGN WORK IN FUTURE ENGINEERING SYSTEMS?
    Wynn, D. C.
    Caldwell, N. H. M.
    Clarkson, P. J.
    11TH INTERNATIONAL DESIGN CONFERENCE (DESIGN 2010), VOL 1-3, 2010, : 1691 - 1702
  • [3] Trends in Technology and Engineering - Consequences of Modularisation for Process Automation
    Kegel, Gunther
    Schaudel, Dieter
    ATP EDITION, 2014, (12): : 44 - 49
  • [4] Using real time constraints for modularisation
    Kirk, B
    Nigro, L
    Pupo, F
    MODULAR PROGRAMMING LANGUAGES, 1997, 1204 : 236 - 251
  • [5] A Slack approach to optimised modularisation of prefabricated structures using a multi-variable modularisation index
    Tidhar, N.
    Li, Y.
    Baduge, K. S. Kristombu
    Mendis, P.
    Thilakarathna, P. S. M.
    Chandrathilaka, E. R. K.
    STRUCTURES, 2021, 33 : 1235 - 1251
  • [6] Using foresight to prioritise the present
    Bulley, Adam
    Pepper, Gillian
    Suddendorf, Thomas
    BEHAVIORAL AND BRAIN SCIENCES, 2017, 40
  • [7] Reducing forecast uncertainty by using observations in geotechnical engineering
    Huber, Maximilian
    PROBABILISTIC ENGINEERING MECHANICS, 2016, 45 : 212 - 219
  • [8] Modularisation and offsite in engineering construction: an early decision-support tool
    Goodier, Chris
    Gibb, Alistair
    Mancini, Mauro
    Turck, Christoph
    Gjepall, Osman
    Daniels, Edwin
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (06) : 3 - 14
  • [9] FORECAST - NO CHANGE
    不详
    ECONOMIST, 1956, 181 (05): : 417 - 418
  • [10] Teaching Web Engineering using a Project Component
    Krutz, Daniel E.
    Meneely, Andrew
    2013 IEEE FRONTIERS IN EDUCATION CONFERENCE, 2013,