共 36 条
- [3] Environmental consequences of dam construction: a case study from Saudi Arabia Arabian Journal of Geosciences, 2018, 11
- [6] Adaptive Management of Return Flows: Lessons from a Case Study in Environmental Water Delivery to a Floodplain River Environmental Management, 2018, 61 : 481 - 496
- [7] Integrated modelling of a new dam: a case study from the "HELP" Mesta/Nestos River 18TH WORLD IMACS CONGRESS AND MODSIM09 INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION: INTERFACING MODELLING AND SIMULATION WITH MATHEMATICAL AND COMPUTATIONAL SCIENCES, 2009, : 4050 - 4056
- [9] Exploration a New Model for Assessment the Environmental Risk of Dams in Construction Stage (Case Study: Balarood Dam, Khuzestan) NEXO REVISTA CIENTIFICA, 2021, 34 (04): : 1215 - 1230
- [10] DEVELOPING A QUANTITATIVE MODEL FOR ENVIRONMENTAL RESOURCE MANAGEMENT IN THE FUNCTIONAL SCOPE OF LARGE DAMS. A CASE STUDY OF KARKHEH DAM ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2021, 20 (01): : 25 - 35