Experimental study on mooring, towing and installing of immersed tunnel caissons

被引:19
|
作者
Xiao L.-F. [1 ]
Yang J.-M. [1 ]
Li R.-P. [1 ]
机构
[1] State Key Laboratory of Ocean Engineering, Shanghai Jiaotong University
关键词
Caisson; Immersed tunnel; Installation; Model test;
D O I
10.1007/s12204-010-8705-6
中图分类号
学科分类号
摘要
Mooring, towing and installing tests on immersed tunnel caissons across the Yong River are carried out in basin to investigate the motions and line tensions. In the towing operation, the maximum tension exists in the case that half caisson is exposed to waves and currents. The cooperation of operating manually on many lines at the same time is very difficult and important. The dynamic behavior of the caisson and the line tensions are affected more by the manual operations than by waves and currents. In the installing operation, the tensions of hoisting lines are much larger than the positioning lines. © Shanghai Jiaotong University and Springer-Verlag Berlin Heidelberg 2010.
引用
收藏
页码:103 / 107
页数:4
相关论文
共 50 条
  • [1] Experimental Study on Mooring,Towing and Installing of Immersed Tunnel Caissons
    肖龙飞
    杨建民
    李润培
    JournalofShanghaiJiaotongUniversity(Science), 2010, 15 (01) : 103 - 107
  • [2] Towing maneuvering simulation of immersed tunnel cube
    Zhang, Xiaotu
    Zhang, Lewen
    Liu, Zuyuan
    Wuhan Jiaotong Keji Daxue Xuebao/Journal of Wuhan Transportation University, 1999, 23 (05): : 533 - 536
  • [3] Numerical study on Sinking Mooring System of Immersed Tube Tunnel Construction
    Qiu Zhengzhong
    Wan Meng
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ADVANCED ENGINEERING MATERIALS AND TECHNOLOGY, 2015, 38 : 230 - 234
  • [4] Use of Suction Piles for Temporary Mooring of Immersed Tunnel Elements
    Cho, I. H.
    Kwag, D. J.
    Bang, S.
    Cho, Y.
    PROCEEDINGS OF THE EIGHTEENTH (2008) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2008, : 665 - +
  • [5] Experimental study on grouting foundation treatment of immersed tunnel
    Li, Ke
    PROCEEDINGS OF 2ND INTERNATIONAL SYMPOSIUM ON SUBMERGED FLOATING TUNNELS AND UNDERWATER TUNNEL STRUCTURES (SUFTUS-2016), 2016, 166 : 317 - 325
  • [6] Experimental Study of Optimizing the Mooring Configuration of the Tunnel-Pontoons System
    Huang, Guoxing
    Song, Yue
    Zhang, Ningchuan
    Shi, Xianying
    INTERNATIONAL JOURNAL OF OFFSHORE AND POLAR ENGINEERING, 2017, 27 (03) : 301 - 309
  • [7] Experimental study on the mooring tension of tunnel element during immersion standby
    Song, Yue
    Huang, Guoxing
    Zhang, Ningchuan
    Pei, Yuguo
    OCEAN ENGINEERING, 2016, 112 : 25 - 32
  • [8] Experimental study on joint behaviour of immersed tunnel subjected to differential settlement
    Li, Jianfeng
    Ni, Pengpeng
    Lu, Zhiwang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 156
  • [9] Centrifugal model experimental study on natural foundation of immersed tube tunnel
    Yue, Xia-bing
    Xie, Yong-li
    Hu, Zhi-nan
    Zhang, Hong-guang
    Xu, Guo-ping
    MODELING AND COMPUTATION IN ENGINEERING II, 2013, : 253 - 259
  • [10] Experimental Study of the Concrete Cracking Behavior of an Immersed Tunnel under Fire
    Duan, Jintao
    Qiu, Peiyun
    Liu, Jianyong
    Wu, Xin
    BUILDINGS, 2023, 13 (06)