Balancing and scheduling of flexible mixed model assembly lines with parallel stations

被引:0
|
作者
Cemalettin Öztürk
Semra Tunalı
Brahim Hnich
Arslan Örnek
机构
[1] İzmir University of Economics,Department of Industrial Systems Engineering
[2] İzmir University of Economics,Department of Business Administration
[3] İzmir University of Economics,Department of Computer Engineering
关键词
Mixed model assembly lines; Balancing; Scheduling; Flexible manufacturing; Mixed integer programming;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we study flexible mixed model assembly lines with serially connected stages where stages may have one or more parallel stations. Station parallelism in flexible mixed model assembly lines improves system reliability and enables rapid adaptability to customer demand fluctuations. However, in order to effectively manage such lines under real-world conditions, there is a need to extend traditional assembly line management methods. This study extends the current research by simultaneously considering the problems of task assignment and model scheduling on parallel stations. Furthermore, scheduling of assigned tasks on each station is considered. We formulate the problem context first as a mixed integer programming model and then develop a decomposition scheme for large scale applications. Finally, we compare the performance of the proposed model and decomposition scheme using various size test instances.
引用
收藏
页码:2577 / 2591
页数:14
相关论文
共 50 条
  • [1] Balancing and scheduling of flexible mixed model assembly lines with parallel stations
    Ozturk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Ornek, Arslan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2577 - 2591
  • [2] Cyclic scheduling of flexible mixed model assembly lines with parallel stations
    Insight Centre for Data Analytics, University College Cork, Cork, Ireland
    不详
    不详
    不详
    J Manuf Syst, (147-158):
  • [3] Cyclic scheduling of flexible mixed model assembly lines with parallel stations
    Öztürk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Örnek, Arslan
    Journal of Manufacturing Systems, 2015, 36 : 147 - 158
  • [4] Cyclic scheduling of flexible mixed model assembly lines with parallel stations
    Ozturk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Ornek, Arslan
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 147 - 158
  • [5] Balancing and cyclical scheduling of asynchronous mixed-model assembly lines with parallel stations
    Lopes, Thiago Cantos
    Michels, Adalberto Sato
    Stall Sikora, Celso Gustavo
    Magatao, Leandro
    JOURNAL OF MANUFACTURING SYSTEMS, 2019, 50 : 193 - 200
  • [6] Balancing and scheduling of flexible mixed model assembly lines
    Cemalettin Öztürk
    Semra Tunalı
    Brahim Hnich
    M. Arslan Örnek
    Constraints, 2013, 18 : 434 - 469
  • [7] Balancing and scheduling of flexible mixed model assembly lines
    Ozturk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Ornek, M. Arslan
    CONSTRAINTS, 2013, 18 (03) : 434 - 469
  • [8] Balancing and sequencing of parallel mixed-model assembly lines
    Ozcan, Ugur
    Cercioglu, Hakan
    Gokcen, Hadi
    Toklu, Bilal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (17) : 5089 - 5113
  • [9] Balancing of parallel assembly lines with mixed-model product
    Ismail, N.
    Esmaeilian, G. R.
    Hamedi, M.
    Sulaiman, S.
    MANAGEMENT AND ARTIFICIAL INTELLIGENCE, 2011, 6 : 120 - 124
  • [10] Parallel optimization of the balancing and sequencing for mixed-model assembly lines
    Zhang W.
    Hou L.
    Gan Y.
    Xu C.
    Bu X.
    Lin H.
    Manufacturing Technology, 2019, 19 (03): : 537 - 544