Safety Assessment of a Nuclear Power Plant with Gas-Turbine Back-Up for Internal Needs

被引:0
|
作者
R. Z. Aminov
V. T. Beresh
机构
[1] Saratov Science Center (Russian Academy of Sciences),Povolozh'e Division of Power Generation
来源
Atomic Energy | 2004年 / 96卷
关键词
Power Plant; Nuclear Power Plant; Safety Assessment;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:434 / 438
页数:4
相关论文
共 50 条
  • [1] Safety assessment of a nuclear power plant with gas-turbine back-up for internal needs
    Aminov, RZ
    Beresh, VT
    ATOMIC ENERGY, 2004, 96 (06) : 434 - 438
  • [2] COMBINED NUCLEAR + GAS-TURBINE PLANT
    SURKOV, VV
    THERMAL ENGINEERING, 1981, 28 (10) : 610 - 611
  • [3] GAS-TURBINE NUCLEAR POWER PLANTS
    KATTERHE.AA
    REACTOR TECHNOLOGY, 1969, 13 (01): : 7 - &
  • [4] GAS-TURBINE POWER PLANT FOR AIRCRAFT
    CAMBEL, AB
    JOURNAL OF THE AERONAUTICAL SCIENCES, 1952, 19 (11): : 791 - 792
  • [5] REFERENCE DESIGN OF HTGR NUCLEAR GAS-TURBINE POWER-PLANT
    HODZIC, A
    HAFERKAMP, D
    ARNDT, E
    ENDRES, F
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 20 (APR21): : 119 - 120
  • [6] PERFORMANCE OF AN INDUSTRIAL GAS-TURBINE POWER PLANT
    BOLLIGER, HR
    BROWN BOVERI REVIEW, 1968, 55 (1-2): : 15 - &
  • [7] Thermodynamic Analysis of a Space Nuclear Power Plant with a Gas-Turbine Energy Conversion System
    Soldatov, V. A.
    Soldatov, A. V.
    ATOMIC ENERGY, 2014, 115 (03) : 168 - 175
  • [8] Thermodynamic Analysis of a Space Nuclear Power Plant with a Gas-Turbine Energy Conversion System
    V. A. Soldatov
    A. V. Soldatov
    Atomic Energy, 2014, 115 : 168 - 175
  • [9] Aeroderivative gas turbine back-up capability with compressed air injection
    Abudu, Kamal
    Igie, Uyioghosa
    Roumeliotis, Ioannis
    Szymanski, Artur
    Di Lorenzo, Giuseppina
    APPLIED THERMAL ENGINEERING, 2020, 180
  • [10] A 150 MW POWER GENERATING GAS-TURBINE PLANT
    BODROV, IS
    OGURTSOV, AP
    REZNICHENKO, VY
    THERMAL ENGINEERING, 1979, 26 (11) : 641 - 647