共 32 条
- [4] Seepage regime in the foundation of the Sayano-Shushenskoe hydroelectric station dam during staged filling of the reservoir Hydrotechnical Construction, 1991, 24 (08): : 525 - 530
- [5] Seepage regime in the foundation of the Sayano-Shushenskoe hydroelectric station dam during staged filling of the reservoir Hydrotechnical Construction (English translation of Gidrotekhnicheskoe Stroitel'stvo), 1991, 24 (08): : 525 - 530
- [6] Set of geodetic observations of overall displacements of the Dam for the Sayano-Shushenskoe Hydroelectric Power Plant Power Technology and Engineering, 1998, 32 (09): : 536 - 539
- [8] Seasonal Changes in the Parameters of the Normal Modes of the Chirkey Hydroelectric Power Plant Dam According to the Standing Waves Method Power Technology and Engineering, 2020, 53 (06): : 681 - 686
- [9] Features of Sayano-Shushenskaya hydroelectric power plant dam behaviour at the filling of water storage basin up to the projected level Gidrotekhnicheskoe Stroitel'stvo, 1994, (04): : 21 - 25
- [10] Modified FMEA for risk management in geotechnical structures during hydraulic circuit filling of a hydroelectric power plant SOILS AND ROCKS, 2024, 47 (01):