Solving resource-constrained project scheduling problems with bi-criteria heuristic search techniques

被引:3
|
作者
M. Kamrul Ahsan
De-bi Tsao
机构
[1] Tokyo Institute of Technology,Department of Industrial Engineering and Management
关键词
Resource-constrained project scheduling; search algorithm; heuristics; state-space representation;
D O I
10.1007/s11518-006-0129-3
中图分类号
学科分类号
摘要
In this paper we formulate a bi-criteria search strategy of a heuristic learning algorithm for solving multiple resource-constrained project scheduling problems. The heuristic solves problems in two phases. In the pre-processing phase, the algorithm estimates distance between a state and the goal state and measures complexity of problem instances. In the search phase, the algorithm uses estimates of the pre-processing phase to further estimate distances to the goal state. The search continues in a stepwise generation of a series of intermediate states through search path evaluation process with backtracking. Developments of intermediate states are exclusively based on a bi-criteria new state selection technique where we consider resource utilization and duration estimate to the goal state. We also propose a variable weighting technique based on initial problem complexity measures. Introducing this technique allows the algorithm to efficiently solve complex project scheduling problems. A numerical example illustrates the algorithm and performance is evaluated by extensive experimentation with various problem parameters. Computational results indicate significance of the algorithm in terms of solution quality and computational performance.
引用
收藏
页码:190 / 203
页数:13
相关论文
共 50 条
  • [1] SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS WITH BI-CRITERIA HEURISTIC SEARCH TECHNIQUES
    M Kamrul AHSAN
    De-bi TSAO
    JournalofSystemsScienceandSystemsEngineering, 2003, (02) : 190 - 203
  • [2] A heuristic search algorithm for solving resource-constrained project scheduling problems
    Ahsan, MK
    Tsao, DB
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2003, 20 (02) : 143 - 160
  • [3] Solving resource-constrained project scheduling problems using Tabu Search
    Ikonomou, A
    Galletly, JE
    Daniel, RC
    INTELLIGENT SYSTEMS FOR MANUFACTURING: MULTI-AGENT SYSTEMS AND VIRTUAL ORGANIZATION, 1998, : 311 - 322
  • [4] SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS BY A-STAR SEARCH
    BELL, CE
    PARK, K
    NAVAL RESEARCH LOGISTICS, 1990, 37 (01) : 61 - 84
  • [5] A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problems
    Chand, Shelvin
    Singh, Hemant Kumar
    Ray, Tapabrata
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 225 - 232
  • [6] Adaptive multi-criteria search technique for resource-constrained project scheduling problems
    Ahsan, MK
    Tsao, DB
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2005, 12 (03): : 286 - 295
  • [7] Solving the resource-constrained project problem by a variable neighbourhood scheduling search
    Fleszar, K
    Hindi, KS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 155 (02) : 402 - 413
  • [8] Hybrid local search techniques for the resource-constrained project scheduling problem
    Pesek, Igor
    Schaerf, Andrea
    Zerovnik, Janez
    HYBRID METAHEURISTICS, PROCEEDINGS, 2007, 4771 : 57 - +
  • [9] Meta-heuristic Techniques to Solve Resource-Constrained Project Scheduling Problem
    Roy, Bidisha
    Sen, Asim Kumar
    INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING AND COMMUNICATIONS, VOL 2, 2019, 56 : 93 - 99
  • [10] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +