Probabilistic Flow Duration Curves for Small Hydro Plant Design and Performance Evaluation

被引:0
|
作者
Ioannis A. Niadas
Panos G. Mentzelopoulos
机构
[1] Z&A – P. Antonaropoulos & Associates S.A.,
[2] P. Mentzelopoulos Engineering Consulting,undefined
来源
Water Resources Management | 2008年 / 22卷
关键词
Flow duration curve; Small hydro plants; Probabilistic flow model; Log-normal distribution; Energy output; Financial risk; Environmental flow;
D O I
暂无
中图分类号
学科分类号
摘要
This work presents a probabilistic flow duration methodology that can be used as an alternative approach to the design and performance evaluation of small hydro plants. The probabilistic approach aims to quantify the uncertainty influencing the design and the economic outlook of small hydropower projects thus overcoming the limitations of the standard design methodology, which is based on a deterministic approach through the historical flow duration curve at the intake site. A simple probabilistic flow duration curve model is presented and an applied case study of the probabilistic approach to plant design and evaluation is provided based on a typical small hydro plant in a mountainous region of Greece. The results of this study however are not restricted to any particular geographical region and the methodology can be applied in a variety of hydrologic and economic environments.
引用
收藏
页码:509 / 523
页数:14
相关论文
共 50 条
  • [1] Probabilistic flow duration curves for small hydro plant design and performance evaluation
    Niadas, Ioannis A.
    Mentzelopoulos, Panos G.
    WATER RESOURCES MANAGEMENT, 2008, 22 (04) : 509 - 523
  • [2] Probabilistic evaluation of flow duration curves in semi-arid basins
    Iacobellis, V
    Piccinni, AF
    Giordano, C
    PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON RIVER SEDIMENTATION, VOLS 1-4, 2004, : 2448 - 2455
  • [3] Performance evaluation of flow duration curves regionalization methods
    Alpoin Piol, Marcos Vinicius
    Tosta dos Reis, Jose Antonio
    Costa Caiado, Marco Aurelio
    Ferreira Mendonca, Antonio Sergio
    RBRH-REVISTA BRASILEIRA DE RECURSOS HIDRICOS, 2019, 24
  • [4] Probabilistic flow duration curves for use in environmental planning and management
    Claps, P
    Fiorentino, M
    INTEGRATED APPROACH TO ENVIRONMENTAL DATA MANAGEMENT SYSTEMS, 1997, 31 : 255 - 266
  • [5] Probabilistic model for the estimation of T year flow duration curves
    Iacobellis, Vito
    WATER RESOURCES RESEARCH, 2008, 44 (02)
  • [7] Performance Evaluation of an Isolated Small Hydro Power Plant Using Conventional Controllers
    Pravin, P. S.
    Jaleel, Abdul J.
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON CIRCUITS, POWER AND COMPUTING TECHNOLOGIES (ICCPCT 2013), 2013, : 58 - 62
  • [8] Stochastic flow duration curves for evaluation of flow regimes in rivers
    Sugiyama, H
    Vudhivanich, V
    Whitaker, AC
    Lorsirirat, K
    JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2003, 39 (01): : 47 - 58
  • [9] PROJECT DESIGN DOCUMENTS FOR SMALL HYDRO POWER PLANT
    Kuzevic, Stefan
    Gergelova, Marcela
    Kuzevicova, Zofia
    Rybar, Radim
    ENERGY AND CLEAN TECHNOLOGIES, 2015, : 409 - 416
  • [10] PRACTICAL SOLUTIONS FOR SMALL HYDRO POWER PLANT DESIGN
    Piraianu, Vlad Florin
    Ilinca, Cornel
    18TH EUROPEAN CONCURRENT ENGINEERING CONFERENCE (ECEC 2012)/8TH FUTURE BUSINESS TECHNOLOGY CONFERENCE (FUBUTEC 2012), 2012, : 59 - 62