Construction simulation and real-time control for high arch dam

被引:0
|
作者
Zhong D.-H. [1 ]
Ren B.-Y. [1 ]
Wu K.-X. [1 ]
机构
[1] School of Civil Engineering, Tianjin University
基金
中国国家自然科学基金;
关键词
Dynamic simulation; High arch dam construction; Real-time control; Schedule forecasting;
D O I
10.1007/s12209-008-0044-4
中图分类号
学科分类号
摘要
A method of combining dynamic simulation with real-time control was proposed to fit the randomness and uncertainty in the high arch dam construction process. The mathematical logic model of high arch dam construction process was established. By combining dynamic construction simulation with schedule analysis, the process of construction schedule forecasting and analysis based on dynamic simulation was studied. The process of real-time schedule control was constructed and some measures for dynamic adjustment and control of construction schedule were provided. A system developed with the method is utilized in a being constructed hydroelectric project located at the Yellow River in northwest China, which can make the pouring plan of the dam in the next stage (a month, quarter or year) to guide the practical construction. The application result shows that the system provides an effective technical support for the construction and management of the dam.
引用
收藏
页码:248 / 253
页数:5
相关论文
共 50 条
  • [1] Construction Simulation and Real-Time Control for High Arch Dam
    钟登华
    任炳昱
    吴康新
    Transactions of Tianjin University, 2008, (04) : 248 - 253
  • [2] Real-Time Temperature Control for High Arch Dam Based on Decision Support System
    井向阳
    刘杏红
    周伟
    常晓林
    Transactions of Tianjin University, 2014, 20 (02) : 118 - 125
  • [3] Real-Time Temperature Control for High Arch Dam Based on Decision Support System
    井向阳
    刘杏红
    周伟
    常晓林
    Transactions of Tianjin University, 2014, (02) : 118 - 125
  • [4] Real-time temperature control for high arch dam based on decision support system
    Jing X.
    Liu X.
    Zhou W.
    Chang X.
    Transactions of Tianjin University, 2014, 20 (02) : 118 - 125
  • [5] CONSTRUCTION SCHEDULE OPTIMIZATION FOR HIGH ARCH DAMS BASED ON REAL-TIME INTERACTIVE SIMULATION
    Guan, Tao
    Zhong, Denghua
    Ren, Bingyu
    Cheng, Pu
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2015, 11 (04) : 1321 - 1342
  • [6] Theory on real-time control of construction quality and progress and its application to high arc dam
    ZHONG DengHua1
    2 Ertan Hydropower Development Company
    Science China(Technological Sciences), 2010, (10) : 2611 - 2618
  • [7] Theory on real-time control of construction quality and progress and its application to high arc dam
    Zhong DengHua
    Ren BingYu
    Li MingChao
    Wu BinPing
    Li MingChuan
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2010, 53 (10) : 2611 - 2618
  • [8] Theory on real-time control of construction quality and progress and its application to high arc dam
    DengHua Zhong
    BingYu Ren
    MingChao Li
    BinPing Wu
    MingChuan Li
    Science China Technological Sciences, 2010, 53 : 2611 - 2618
  • [9] Theory on real-time control of construction quality and progress and its application to high arc dam
    ZHONG DengHua REN BingYu LI MingChao WU BinPing LI MingChuan Department of Hydraulic and Hydroelectric Engineering School of Civil Engineering Tianjin University Tianjin China Ertan Hydropower Development Company Ltd Chengdu China
    Science China(Technological Sciences), 2010, 53 (10) : 2611 - 2618
  • [10] Simulation for the Spatial–Time Characteristics of High Arch Dam
    Zou L.
    Chen S.
    Wang G.
    Fu S.
    Tang X.
    Xu Q.
    Zhao Z.
    Wang W.
    Xie M.
    He J.
    Geotechnical and Geological Engineering, 2016, 34 (4) : 949 - 980