Development of technical solutions for optimizing the hydraulic and thermal process circuits of the P-90 heat-recovery boiler used as part of the PGU-450T combined-cycle plant at the severozapadnaya cogeneration station
Results from work on analyzing the performance of the P-90 heat-recovery boilers used as part of the PGU-450T-based Unit 1 at the Severozapadnaya cogeneration station and on revealing factors causing damage to the bends of evaporating tubes are presented. Technical solutions using which a V-94.2 gas turbine can be replaced by a GTE-160 gas turbine are considered.