Large-scale inflatable structures for tunnel protection: a review of the Resilient Tunnel Plug project

被引:0
|
作者
Sosa E.M. [1 ]
Thompson G.J. [1 ]
Holter G.M. [2 ]
Fortune J.M. [3 ]
机构
[1] Department of Mechanical and Aerospace Engineering, West Virginia University, Morgantown, WV
[2] Pacific Northwest National Laboratory, Richland, WA
[3] Technology Directorate, Washington, DC
来源
J Infrastruct Preserv Resil | 2020年 / 1卷 / 1期
关键词
Confined inflatable; Conformity; Deployment; Folding; Inflation; Membrane; Plug; Tunnel; Vectran;
D O I
10.1186/s43065-020-00011-0
中图分类号
学科分类号
摘要
The protection of underground civil infrastructure continues to be a high priority for transportation and transit security agencies. In particular, rail transit tunnels running under bodies of water are susceptible to disruptions due to flooding caused by extraordinary climatic events such as hurricanes or other events resulting from human activities. Several events have taken place in the past decades that have demonstrated the need to mitigate vulnerabilities or, at least, minimize the consequences of catastrophic events. Although it is impossible to prevent all situations that can lead to flooding, damage can be substantially decreased by reducing the area affected by the event. To minimize the effects of an event, a possible approach is to compartmentalize the tunnel system by creating temporary barriers that can contain the propagation of flooding until a more permanent solution can be implemented. One way to create a temporary barrier is by the deployment of a large-scale inflatable structure, also known as an inflatable plug. In such an application, the inflatable structure is prepared for placement, either permanently or temporally, and maintained ready for deployment, inflation, and pressurization when needed. The internal plug pressure imparts a normal force against the tunnel wall surface with the friction between the plug and tunnel surfaces opposing axial movement of the plug. The sealing effectiveness depends on the ability of the inflatable structure to self-deploy and fit, without human intervention, to the intricacies of the perimeter of the conduit being sealed. Primary design constraints include having the plug stowed away from the dynamic envelope of the trains and being able to withhold the pressure of the flooding water. This work presents a compilation of the main aspects of the activities completed for the development of large-scale inflatable structures as part of the Resilient Tunnel Plug (RTP) Project. The main test results and lessons learned are presented to demonstrate the viability of implementing large-scale inflatable plugs for the containment of flooding in rail tunnels systems. Over 400 coupon and specimen tests, 200 reduced scale tests, and 100 full-scale tests were conducted to demonstrate the efficacy of the design of different prototypes over a 10-year research and development project. The culmination of the work was 12 large-scale flooding demonstrations where the inflatable tunnel plug was shown able to be deployed remotely and withstand a simulated flooding event. © The Author(s) 2020.
引用
收藏
相关论文
共 50 条
  • [1] FE simulation of ceiling deployment of a large-scale inflatable structure for tunnel sealing
    Pecora, Iole
    Sosa, Eduardo M.
    Thompson, Gregory J.
    Barbero, Ever J.
    THIN-WALLED STRUCTURES, 2019, 140 : 272 - 293
  • [2] Study on the Aerator of Spillway Tunnel in One Large-scale Project
    Wang, Siying
    Yang, Jinbo
    Wang, Caihuan
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS I AND II, 2013, : 1290 - 1295
  • [3] Starting Process in a Large-Scale Shock Tunnel
    Wang, Yunpeng
    Hu, Zongmin
    Liu, Yunfeng
    Jiang, Zonglin
    AIAA JOURNAL, 2016, 54 (04) : 1240 - 1249
  • [4] Archaeological Challenges in Cooperating on a Large-Scale Construction Project: The Immersed Tunnel, Oslo, Norway
    Gundersen, Jostein
    HISTORIC ENVIRONMENT-POLICY & PRACTICE, 2010, 1 (01): : 6 - 26
  • [5] A large-scale fire test of an immersed tunnel under the protection of fire resistive coating
    Duan, Jintao
    Dong, Yuli
    Xiao, Jianzhuang
    Zhang, Dashan
    Zheng, Wei
    Zhang, Shengyao
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 111
  • [6] Application of drainage tunnel in large-scale landslide treatment
    Lin Canyang
    2015 SEVENTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2015), 2015, : 188 - 191
  • [7] Seismic design of large-scale cut and cover tunnel
    Adachi, Y
    Fujii, Y
    Ishizaki, H
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 947 - 951
  • [8] Research on 3D geomechanics model test for a large-scale offspur tunnel project
    Zhang, Q. Y.
    Li, S. C.
    Guo, X. H.
    Experimental Mechanics in Nano and Biotechnology, Pts 1 and 2, 2006, 326-328 : 557 - 560
  • [9] Implementing a large tunnel project - The San Vicente Tunnel
    Ahinga, Z
    Stine, G
    Sherry, G
    NORTH AMERICAN TUNNELING 2002, 2002, : 203 - 209
  • [10] Stability analysis of rock pillar between tunnel and large-scale concealed cave on top of tunnel
    Guo, Jiaqi
    Ren, Lianwei
    Wang, Guangyong
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1325 - 1328