Solving a large-scale integrated fleet assignment and crew pairing problem

被引:0
|
作者
Okan Örsan Özener
Melda Örmeci Matoğlu
Güneş Erdoğan
Mohamed Haouari
Hasan Sözer
机构
[1] Ozyegin University,School of Engineering
[2] University of New Hampshire,Peter T Paul College of Business and Economics
[3] University of Bath,School of Management
[4] Qatar University,Department of Mechanical and Industrial Engineering, College of Engineering
来源
关键词
Fleet assignment; Crew pairing; Airline operations planning; Large-scale neighborhood search;
D O I
暂无
中图分类号
学科分类号
摘要
Airline schedule planning problems are typically decomposed into smaller problems, which are solved in a sequential manner, due to the complexity of the overall problems. This results in suboptimal solutions as well as feasibility issues in the consecutive phases. In this study, we address the integrated fleet assignment and crew pairing problem (IFACPP) of a European Airline. The specific network and cost structures allow us to develop novel approaches to this integrated problem. We propose an optimization-driven algorithm that can efficiently handle large scale instances of the IFACPP. We perform a computational study on real-world monthly flight schedules to test the performance of our solution method. Based on the results on instances with up to 27,500 flight legs, we show that our algorithm provides solutions with significant cost savings over the sequential approach.
引用
收藏
页码:477 / 500
页数:23
相关论文
共 50 条
  • [1] Solving a large-scale integrated fleet assignment and crew pairing problem
    Ozener, Okan Orsan
    Matoglu, Melda Ormeci
    Erdogan, Gunes
    Haouari, Mohamed
    Sozer, Hasan
    ANNALS OF OPERATIONS RESEARCH, 2017, 253 (01) : 477 - 500
  • [2] Solving a large-scale crew pairing problem
    Erdogan, Guenes
    Haouari, Mohamed
    Matoglu, Melda Oermeci
    Ozener, Okan Orsan
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2015, 66 (10) : 1742 - 1754
  • [3] The fleet assignment problem: solving a large-scale integer program
    Georgia inst. technology, school industrial systems eng., Atlanta GA 30332-0205, United States
    Mathematical Programming, Series B, 1995, 70 (03): : 211 - 232
  • [4] THE FLEET ASSIGNMENT PROBLEM - SOLVING A LARGE-SCALE INTEGER-PROGRAM
    HANE, CA
    BARNHART, C
    JOHNSON, EL
    MARSTEN, RE
    NEMHAUSER, GL
    SIGISMONDI, G
    MATHEMATICAL PROGRAMMING, 1995, 70 (02) : 211 - 232
  • [5] A matheuristic for the robust integrated airline fleet assignment, aircraft routing, and crew pairing problem
    Ben Ahmed, Mohamed
    Hryhoryeva, Maryia
    Hvattum, Lars Magnus
    Haouari, Mohamed
    COMPUTERS & OPERATIONS RESEARCH, 2022, 137
  • [6] A Novel Model and Decomposition Approach for the Integrated Airline Fleet Assignment, Aircraft Routing, and Crew Pairing Problem
    Shao, Shengzhi
    Sherali, Hanif D.
    Haouari, Mohamed
    TRANSPORTATION SCIENCE, 2017, 51 (01) : 233 - 249
  • [7] On Large-Scale Airline Crew Pairing Generation
    Aggarwal, Divyam
    Saxena, Dhish Kumar
    Emmerich, Michael
    Paulose, Saaju
    2018 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (IEEE SSCI), 2018, : 593 - 600
  • [8] Dynamic Constraint Aggregation for Solving Very Large-scale Airline Crew Pairing Problems
    Desaulniers G.
    Lessard F.
    Saddoune M.
    Soumis F.
    SN Operations Research Forum, 1 (3):
  • [9] Integrated Airline Crew Pairing and Crew Assignment by Dynamic Constraint Aggregation
    Saddoune, Mohammed
    Desaulniers, Guy
    Elhallaoui, Issmail
    Soumis, Francois
    TRANSPORTATION SCIENCE, 2012, 46 (01) : 39 - 55
  • [10] Solving a large-scaled crew pairing problem by using a genetic algorithm
    Park, Taejin
    Ryu, Kwang Ryel
    ADVANCES IN APPLIED ARTICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4031 : 228 - 237