DETERMINING THE REMAINING PRESTRESS FORCE IN A PRESTRESSED CONCRETE RAILROAD TIE THROUGH LOADING IN DIRECT TENSION

被引:0
|
作者
Scott, James D. [1 ]
Peterman, Robert J. [1 ]
Beck, B. Terry [2 ]
Robertson, Aaron A. [2 ]
Riding, Kyle A. [3 ]
Wu, Chih-Hang John [4 ]
机构
[1] Kansas State Univ, CE Dept, Manhattan, KS 66506 USA
[2] Kansas State Univ, MNE Dept, Manhattan, KS 66506 USA
[3] Univ Florida, CCE Dept, Gainesville, FL USA
[4] Kansas State Univ, IMSE Dept, Manhattan, KS 66506 USA
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Extensive research has been conducted by the research team in recent years to determine the prestressing steel and concrete properties that must be provided to ensure that the transfer length of a prestressed concrete railroad tie is shorter than the distance from the edge of the tie to the rail seat. In addition, a significant of amount of data has been collected that indicates high bonding stresses can produce longitudinal splitting cracks along the reinforcement. In a study of how prestressing steel and concrete properties relate to a ties propensity for longitudinal cracking, existing ties that have performed well in track for over 25 years without issues are being evaluated. One parameter of interest that affects the bonding stress is the amount of prestress force in a railroad tie, which is unknown for the existing ties being evaluated. The current paper focuses on a new method that was developed for determining the remaining prestress force in a tie. In a previous method for determining the prestress force, ties were first loaded in four-point bending to initiate flexural cracking. The crack opening displacement was measured in order to determine the applied load required to reopen the crack. Using this load and the cross-sectional parameters at the location of the crack, the prestress force in the tie can be calculated using static equilibrium. The issue with this method is that as a tie is being loaded and the crack propagates, there is a continuous change in the stiffness of the cross-section. This results in the load versus crack opening displacement curve being overly rounded. This increases the error when determining the load required to reopen the crack, and increases the uncertainty of the calculated prestress force. The new test method eliminates the problems associated with flexural testing by loading the ties longitudinally in tension. In the new proposed experimental method, ties that have been pre-cracked in the center are pulled in tension. Similar to the previous method, the crack opening displacement is measured while the tie is loaded. For the crack to fully open, the applied load must exceed the prestress force holding the crack closed. Prior to the crack opening, the applied load is resisted by the composite section of concrete and prestressing tendons. Once the crack as fully opened, the applied load is resisted by the prestessing tendons only. This creates two distinctly linear portions of the load versus crack opening displacement curve, one prior to the crack opening, and one after. The beginning of the linear portion post-crack opening marks a very clear upper bound for the amount of prestressing force in a tie. This method can estimate the remaining prestress force in a tie with much greater accuracy than the previous method, and eliminates the need of the cross-sectional parameters at the crack location. To verify this method, tests were first conducted on a smaller scale with prismatic beams with a known initial prestressing force. Then the method was applied to a full scale existing tie to determine the remaining prestress force. Results are presented for testing of both the prismatic beams, and the full scale tie.
引用
收藏
页数:10
相关论文
共 40 条
  • [1] DETERMINING THE REMAINING PRESTRESS FORCE IN A PRESTRESSED CONCRETE CROSSTIE
    Scott, James D.
    Robertson, Aaron A.
    Peterman, Robert J.
    Beck, B. Terry
    Riding, Kyle A.
    Wu, John
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2017, 2017,
  • [2] THE EFFECT OF HIGHER PRESTRESS ON CONCRETE RAILROAD TIE BEHAVIOR
    Catella, N. D.
    Mayville, R. A.
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2015, 2015,
  • [3] Instrument to evaluate remaining prestress in damaged prestressed concrete bridge girders
    Univ of Texas at Austin, Austin, United States
    PCI J, 2 (62-71):
  • [4] Instrument to evaluate remaining prestress in damaged prestressed concrete bridge girders
    Civjan, SA
    Jirsa, JO
    Carrasquillo, RL
    Fowler, DW
    PCI JOURNAL, 1998, 43 (02): : 62 - 71
  • [5] PRESTRESSED CONCRETE MEMBERS IN DIRECT TENSION
    WHEEN, RJ
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1979, 105 (07): : 1471 - 1487
  • [6] Identifying the Prestress Force in Prestressed Concrete Bridges Using Ultrasonic Technology
    Hussin, Manal
    Chan, Tommy H. T.
    Fawzia, Sabrina
    Ghasemi, Negareh
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2020, 20 (10)
  • [7] PRESTRESSED CONCRETE MEMBERS IN DIRECT TENSION - DISCUSSION
    SOMAYAJI, S
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1980, 106 (08): : 1827 - 1830
  • [8] State-of-the-Art Review on Determining Prestress Losses in Prestressed Concrete Girders
    Bonopera, Marco
    Chang, Kuo-Chun
    Lee, Zheng-Kuan
    APPLIED SCIENCES-BASEL, 2020, 10 (20): : 1 - 14
  • [9] Variation of prestress force in a prestressed concrete bridge during the first 30 months
    Saiidi, M. Saiid
    Shields, Joseph
    O'Connor, Daniel
    Hutchens, Eric
    Journal of Engineering and Applied Science, 1996, 41 (05): : 66 - 72
  • [10] A coring method for the nondestructive evaluation of effective prestress force in prestressed concrete structures
    Pessiki, S
    Wang, JL
    REVIEW OF PROGRESS IN QUANTITATIVE NONDESTRUCTIVE EVALUATION, VOLS 15A AND 15B, 1996, 15 : 1831 - 1838