Study on Leading-phase Operation Capability of a 770 MW Jumbo Hydro-generator based on Stability Analysis and End-Region Heat Analysis
被引:3
|作者:
Fan, Zhen-nan
[1
]
Zhou, Zhi-ting
[1
]
Li, Jian-fu
[2
]
Wen, Kun
[1
]
Wang, Jun
[1
]
Sun, Zhang
[1
]
Wang, Tao
[1
]
Yao, Bing
[1
]
机构:
[1] Xihua Univ, Minist Educ, Key Lab Fluid & Power Machinery, Chengdu, Sichuan, Peoples R China
[2] Dong Fang Elect Machinery Co Ltd, Deyang, Peoples R China
关键词:
770MW jumbo hydroelectric generator;
Leading-phase operation capability;
Power system stability;
Electromagnetic analysis;
Temperature;
D O I:
10.5370/JEET.2018.13.3.1317
中图分类号:
TM [电工技术];
TN [电子技术、通信技术];
学科分类号:
0808 ;
0809 ;
摘要:
A generator-grid coupling calculation model is established to study the leading-phase operational capability of a 770 MW jumbo hydro-generator in a Chinese ultra-mega hydropower station. The static and dynamic stability of the generator are analyzed and calculated to obtain stability limits under leading-phase operating conditions. Three-dimensional (3D) time-varying nonlinear moving electromagnetic and temperature field models of the generator end-region are also established and used to determine the magnetic field, loss, and temperature of the end-region under the leadingphase operating condition. The simulation results agree with data measured from the actual 770 MW hydro-generator. This paper provides reliable reference data for the leading-phase operation of a jumbo hydro-generator, which will help to improve in the design and manufacture of future hydro-generators.