Evaluation of Waterlogging Risk in an Urban Subway Station

被引:24
|
作者
Yu, Haiying [1 ,2 ]
Liang, Chuan [1 ]
Li, Ping [3 ]
Niu, Kaijie [1 ]
Du, Faxing [4 ]
Shao, Junhu [2 ]
Liu, Yuyong [5 ]
机构
[1] Sichuan Univ, Chengdu, Sichuan, Peoples R China
[2] Sichuan Normal Univ, Chengdu, Sichuan, Peoples R China
[3] Tsinghua Univ, Beijing, Peoples R China
[4] China Three Gorges Univ, Yichang, Peoples R China
[5] China Railway Southwest Res Inst Co LTD, Chengdu, Sichuan, Peoples R China
关键词
METHODOLOGY;
D O I
10.1155/2019/5393171
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Most cities in the world have extensive underground facilities, including public transport and commercial facilities, such as shopping malls, subways, and parks. Safety of underground space has been an important aspect of urban safety. Due to the influences of global climate change and human activities, waterlogging disasters in cities are becoming increasingly serious and underground facilities easily suffer from waterlogging disasters. Moreover, waterlogging disasters in cities can cause different degrees of damage to construction period and operating period of urban subway stations. By using the optimal combination weighting method combining subjective and objective weighting, this study assigned weights to evaluation factors. Based on this, a fuzzy synthetic evaluation model for waterlogging risk in the construction and operating periods of urban subway stations was established. Furthermore, the model was applied and verified to be effective in Chengdu Metro Line 4, Sichuan province, China, and the evaluation results coincided with the actual situation. The model in the study provides a new idea for evaluating waterlogging risks in urban subway stations, and these results can offer important information for local government to strengthen management on waterlogging risks.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Research on the evaluation of the resilience of subway station projects to waterlogging disasters based on the projection pursuit model
    Liu, Lanjun
    Wu, Han
    Wang, Junwu
    Yang, Tingyou
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2020, 17 (06) : 7302 - 7331
  • [2] A Method for Prediction of Waterlogging Economic Losses in a Subway Station Project
    Wu, Han
    Wang, Junwu
    MATHEMATICS, 2021, 9 (12)
  • [3] Multi-Dimensional evacuation risk evaluation in standard subway station
    Chen, Junfeng
    Liu, Chang
    Meng, Yangyang
    Zhong, Maohua
    SAFETY SCIENCE, 2021, 142
  • [4] Evaluation of Coupling Construction Risk of Subway Station Project Special Programs
    Gong, Peisong
    Zhang, Yongcheng
    Wang, Yi
    Xiao, Tianlong
    Journal of Railway Engineering Society, 2024, 41 (05) : 100 - 105
  • [5] Evaluation of Traffic Organization Scheme during the Construction of Urban Subway Station based on TransCAD
    Zhang, Bing
    Zhang, Bingjie
    ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 433 - +
  • [6] Study on Risk Assessment of Urban Waterlogging
    Gao, Bin
    Zhao, Xinhua
    Sun, Xin
    Peng, Chenrui
    2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION, VOL 3, PROCEEDINGS, 2009, : 352 - +
  • [7] The Review of Risk Management on Subway Station Building
    Chen, Guixiang
    Wang, Hanchao
    Song, Jiule
    Zhao, Yiqing
    ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 2993 - +
  • [8] AN EVALUATION OF THE SIGNPOSTING SYSTEM IN LARGE SUBWAY STATION
    ARNEGARD, RJ
    HAMMONTREE, ML
    MONTGOMERY, MJ
    PEARSON, GL
    ZWAGA, HJG
    PROCEEDINGS OF THE HUMAN FACTORS SOCIETY 33RD ANNUAL MEETING, VOL 1: PERSPECTIVES, 1989, : 541 - 545
  • [9] Fuzzy comprehensive evaluation model for construction risk analysis in urban subway
    Dai, Chun-Quan
    Zhao, Zeng-Hui
    INTERNATIONAL JOURNAL OF MODELING SIMULATION AND SCIENTIFIC COMPUTING, 2015, 6 (03)
  • [10] Research on the Method of Determining Rainfall Thresholds for Waterlogging Risk in Subway Stations
    Xu, Xinxin
    Li, Zhuolun
    Wang, Mengge
    Wang, Haozheng
    Gong, Yongwei
    WATER, 2024, 16 (11)