A probe-based algorithm for piecewise linear optimization in scheduling

被引:5
|
作者
Ajili, F
El Sakkout, H
机构
[1] Univ London Imperial Coll Sci Technol & Med, London SW7 2AZ, England
[2] Parc Technol Ltd, London SE1 7NX, England
关键词
linear programming; constraint programming; scheduling; hybrid algorithms;
D O I
10.1023/A:1021897321637
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
A scheduling problem with piecewise linear (PL) optimization extends conventional scheduling by imposing a conjunction of combinatorial PL constraints involving the objective function variables. To solve this problem, this paper presents a hybrid algorithm where Constraint Programming (CP) search is supported and driven by a (integer) linear programming solver running on a well-controlled subproblem which is dynamically tightened. The paper discusses and compares different ways of decomposing the problem constraints between the CP search and the solver. We show how the subproblem structure and the piecewise linearity are exploited by the search.
引用
收藏
页码:35 / 48
页数:14
相关论文
共 50 条
  • [1] A Probe-Based Algorithm for Piecewise Linear Optimization in Scheduling
    Farid Ajili
    Hani El Sakkout
    Annals of Operations Research, 2003, 118 : 35 - 48
  • [2] Two-Stage Probe-Based Search Optimization Algorithm for the Traveling Salesman Problems
    Rahman, Md. Azizur
    Ma, Jinwen
    MATHEMATICS, 2024, 12 (09)
  • [3] A DIFFERENCE OF CONVEX OPTIMIZATION ALGORITHM FOR PIECEWISE LINEAR REGRESSION
    Bagirov, Adil
    Taheri, Sona
    Asadi, Soodabeh
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2019, 15 (02) : 909 - 932
  • [4] Peacock: Probe-Based Scheduling of Jobs by Rotating Between Elastic Queues
    Khelghatdoust, Mansour
    Gramoli, Vincent
    EURO-PAR 2018: PARALLEL PROCESSING, 2018, 11014 : 178 - 191
  • [5] PIECEWISE LINEAR OPTIMIZATION
    BRUNNER, JK
    COMPUTING, 1980, 25 (01) : 59 - 76
  • [6] Optimizing scheduling of refinery operations based on piecewise linear models
    Gao, Xiaoyong
    Jiang, Yongheng
    Chen, Tao
    Huang, Dexian
    COMPUTERS & CHEMICAL ENGINEERING, 2015, 75 : 105 - 119
  • [7] New Positional error detection algorithm for a probe-based data storage
    Min, DK
    Hong, S
    PROCEEDINGS OF THE IEEE SENSORS 2004, VOLS 1-3, 2004, : 601 - 604
  • [8] OPTIMIZATION ALGORITHM FOR URBAN RAIL TRANSIT OPERATION SCHEDULING BASED ON LINEAR PROGRAMMING
    Wu, Shuang
    Wu, Jinlong
    Sun, Yifeng
    Yao, Tong
    SCALABLE COMPUTING-PRACTICE AND EXPERIENCE, 2023, 24 (03): : 203 - 216
  • [9] Electrochemical techniques for characterization of stem-loop probe and linear probe-based DNA sensors
    Lai, Rebecca Y.
    Walker, Bryce
    Stormberg, Kent
    Zaitouna, Anita J.
    Yang, Weiwei
    METHODS, 2013, 64 (03) : 267 - 275
  • [10] Optimization algorithm of urban rail transit operation scheduling based on linear programming
    Wang Q.-Y.
    Qu W.-Q.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2023, 53 (12): : 3446 - 3451