Annual Assessment of Large-Scale Introduction of Renewable Energy: Modeling of Unit Commitment Schedule for Thermal Power Generators and Pumped Storages

被引:24
|
作者
Mitani, Takashi [1 ]
Aziz, Muhammad [1 ]
Oda, Takuya [1 ]
Uetsuji, Atsuki [1 ]
Watanabe, Yoko [1 ]
Kashiwagi, Takao [1 ]
机构
[1] Tokyo Inst Technol, Inst Innovat Res, Tokyo 1528550, Japan
关键词
unit commitment; annual analysis; thermal power generator; pumped storage; Tabu search; interior point method; SYSTEM; JAPAN;
D O I
10.3390/en10060738
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The fast-increasing introduction of renewable energy sources (RESes) leads to some problems in electrical power network due to fluctuating generated power. A power system must be operated with provision of various reserve powers like governor free capacity, load frequency control and spinning reserve. Therefore, the generator's schedule (unit commitment schedule) should include the consideration of the various power reserves. In addition, it is necessary to calculate the annual operational costs of electric power systems by solving the unit commitment per week of thermal power generators and pumped storages in order to compare and examine the variance of the operational costs and the operating ratio of the generators throughout the year. This study proposes a novel annual analysis for the thermal power generator and pumped storages under a massive introduction of RESes. A weekly unit commitment schedule (start/stop planning) for thermal power generator and pumped storages has been modeled and calculated for one year evaluation. To solve the generator start/stop planning problem, Tabu search and interior point methods are adopted to solve the operation planning for thermal power generators and the output decision for pumped storages, respectively. It is demonstrated that the proposed method can analyze a one-year evaluation within practical time. In addition, by assuming load frequency control (LFC) constraints to cope with photovoltaic (PV) output fluctuations, the impact of the intensity of LFC constraints on the operational cost of the thermal power generator has been elucidated. The increment of the operational cost of the power supply with increasing PV introduction amount has been shown in concrete terms.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] Robust Approximate Dynamic Programming for Large-Scale Unit Commitment With Energy Storages
    Lan, Yu
    Zhai, Qiaozhu
    Yan, Chao-Bo
    Liu, Xiaoming
    Guan, Xiaohong
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024, 21 (04) : 7401 - 7412
  • [2] Large-Scale Renewable Energy Power Aggregation Modeling Technology
    Jiang, Jiheng
    Zhang, Dehai
    Yu, Tengkai
    Li, Xiaoming
    Lu, Zongxiang
    Wang, Yajun
    Zhang, Rui
    Cui, Tongfei
    2023 6TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND POWER ENGINEERING, REPE 2023, 2023, : 112 - 116
  • [3] UNIT COMMITMENT IN A LARGE-SCALE POWER-SYSTEM INCLUDING FUEL CONSTRAINED THERMAL AND PUMPED-STORAGE HYDRO
    AOKI, K
    SATOH, T
    ITOH, M
    ICHIMORI, T
    MASEGI, K
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1987, 2 (04) : 1077 - 1084
  • [4] Maintenance Schedule of Power Transmission Equipment Considering Large-scale Renewable Energy Access
    Cai, Zhi
    Dai, Sai
    Xu, Dan
    2019 IEEE ASIA POWER AND ENERGY ENGINEERING CONFERENCE (APEEC 2019), 2019, : 296 - 301
  • [5] Monthly unit commitment and security assessment algorithm for large-scale power system
    NARI Technology Development Co. Ltd., Nanjing 210003, China
    不详
    不详
    Dianli Xitong Zidonghue, 2008, 23 (28-30):
  • [6] Assessment of residential scale renewable heating solutions with thermal energy storages
    Berger, Matthias
    Schroeteler, Benjamin
    Sperle, Helene
    Puentener, Patrizia
    Felder, Tom
    ENERGY, 2022, 244
  • [7] Reliability Assessment for Power Systems with Large-scale Renewable Energy Sources
    Lai, Yuan
    Li, Gengyin
    Wang, Yuning
    Li, Hui
    Wang, Zhidong
    2013 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2013,
  • [8] Flexible line ratings in stochastic unit commitment for power systems with large-scale renewable generation
    Jiaying Shi
    Shmuel S. Oren
    Energy Systems, 2020, 11 : 1 - 19
  • [9] Stochastic Unit Commitment With Topology Control Recourse for Power Systems With Large-Scale Renewable Integration
    Shi, Jiaying
    Oren, Shmuel S.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (03) : 3315 - 3324
  • [10] Flexible line ratings in stochastic unit commitment for power systems with large-scale renewable generation
    Shi, Jiaying
    Oren, Shmuel S.
    ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2020, 11 (01): : 1 - 19