An Assessment of Benchmarking Practice Relating to Complex Engineering Assets: A Case Study from an Oil and Gas Production Company

被引:0
|
作者
El-Wardani, Riad [1 ]
Liyanage, Jayantha Prasanna [1 ]
机构
[1] CIAM, N-4021 Stavanger, Norway
关键词
D O I
10.1007/978-3-319-06966-1_20
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Companies are continuously striving for world-class performance by use of various performance management tools and techniques. One such popular technique, proving effective in achieving best-in-class results, is benchmarking. A case study of an oil and gas production company, aiming to drive business performance based on best practice-based learning rather than compliance, shows how benchmarking can be effectively implemented to maintain continuous improvement. Benchmarking practice is assessed across a variety of different departments affecting operations, giving an insight into the diversity and complexities of implementing the practice yet paying attention on learning opportunities, while maintaining focus on the ultimate goal of achieving world-class performance.
引用
收藏
页码:207 / 216
页数:10
相关论文
共 50 条
  • [1] COMPLEX PROJECTS: A CASE STUDY ON TELECOMMUNICATION ENGINEERING PROJECTS COMPLEXITY IN AN OIL AND GAS COMPANY
    Lafeta, Frederico Gonzaga
    de Oliveira Barros, Carlos Frederico
    Coelho Dutra Leal, Paulo de Oliveira
    REVISTA DE GESTAO E PROJETOS, 2016, 7 (01): : 41 - 55
  • [2] Safety Climate Transformation in Oil and Gas Company Ownership Transition (Study Case from Multinational to National Company)
    Djunaidi, Zulkifli
    Wirawan, Mufti
    Susilowati, Indri H.
    Khaliwa, Agra M.
    Kanigara, Shellena A.
    SAFETY AND HEALTH AT WORK, 2024, 15 (03) : 292 - 299
  • [3] Applying the resilience concept in practice: A case study from the oil and gas industry
    Hansson, Lisbeth
    Herrera, Ivonne Andrade
    Kongsvik, Trond
    Solberg, Gaute
    SAFETY, RELIABILITY AND RISK ANALYSIS: THEORY, METHODS AND APPLICATIONS, VOLS 1-4, 2009, : 733 - +
  • [4] The Use of AHP for IT Project Priorization - A Case Study for Oil & Gas Company
    da Silva Nevesa, Adriano Jose
    Camanho, Roberto
    3RD INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT, ITQM 2015, 2015, 55 : 1097 - 1105
  • [5] Concurrent engineering implementation assessment: A case study in an Indonesian manufacturing company
    Karningsih, Putu Dana
    Anggrahini, Dewanti
    Syafi'i, Muhammad Imam
    INDUSTRIAL ENGINEERING AND SERVICE SCIENCE 2015, IESS 2015, 2015, 4 : 200 - 207
  • [6] Determination of Optimal Production Planning in Palm Oil Company (Case Study)
    Siregar, Ikhsan
    Tarigan, Ukurta
    Siregar, Dicky Ardilles
    Anizar
    Sari, Rahmi M.
    Tambunan, Mangara M.
    Ginting, Elisabeth
    Amalia
    Nasution, Tigor Hamonangan
    2017 4TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2017, : 55 - 59
  • [7] TECHNOLOGY ASSESSMENT IN ENGINEERING PRACTICE. THE CASE OF BIOLIQ (R) - FUEL PRODUCTION FROM BIOMASS
    Grunwald, Armin
    Kappler, Gunnar
    Leible, Ludwig
    MANAGEMENT SYSTEMS IN PRODUCTION ENGINEERING, 2013, 10 (02) : 12 - 18
  • [8] ASSESSMENT AS A CONCEPT AND COMPLEX PRACTICE. CASE STUDY
    Negrete Vargas, Maria Amalia Belen
    Alvarez Mendez, Juan Manuel
    Torres Carrasco, Ruth
    6TH INTERNATIONAL CONFERENCE OF EDUCATION, RESEARCH AND INNOVATION (ICERI 2013), 2013, : 4141 - 4148
  • [9] From benchmarking to business process re-engineering: a case study
    Simpson, M
    Kondouli, D
    Wai, PH
    TOTAL QUALITY MANAGEMENT, 1999, 10 (4-5): : S717 - S724
  • [10] Dynamic Supply Chain Practices in Malaysia A Case Study in Oil and Gas Company
    Saad, Shatina
    Udin, Zulkifli Mohamed
    Hasnan, Norlena
    2014 1ST INTERNATIONAL SYMPOSIUM ON TECHNOLOGY MANAGEMENT AND EMERGING TECHNOLOGIES (ISTMET 2014), 2014, : 224 - 229