Research on Operational Performance Evaluation System of Urban Waste Treatment PPP Project Based on AHP

被引:2
|
作者
Sun, Chunling [1 ]
Liu, Yanan [1 ]
Zhang, Tian [1 ]
机构
[1] Tianjin Univ Technol, Tianjin 300384, Peoples R China
关键词
D O I
10.1088/1755-1315/267/4/042067
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Based on the research status of the operational performance indicators of waste treatment projects, according to the relevant standard specifications and accounting the actual operability, this paper established an operational performance evaluation system for waste treatment projects. The constructed evaluation system covers indicators such as economic benefit, social benefit, satisfaction, ecological benefit and project sustainability. The initial data are obtained through questionnaire survey. The weight of each index is determined by AHP, combining the individual indicator status values to obtain the operational performance evaluation criteria. The established indicator system can help managers to provide project management direction, promote the optimization of funding allocation, and improve the operational efficiency of waste treatment projects.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Research on the Performance Evaluation of the Contract Governance in the PPP Mode Based on AHP
    She, Lizhong
    Tang, Sha
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 309 - 317
  • [2] Research on Performance Evaluation System of Shale Gas PPP Project Based on Matter Element Analysis
    Luo, Zhenhua
    Yang, Yufan
    Pan, Haize
    Zhong, Mengfan
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [3] Research on Contractual Relationship Optimization of Urban Construction Waste Disposal PPP Project
    Yue, Qiu
    2018 INTERNATIONAL CONFERENCE ON CONSTRUCTION, AVIATION AND ENVIRONMENTAL ENGINEERING, 2019, 233
  • [4] Evaluation of air pollutants based on embedded system and PPP project performance factors
    Lu M.
    Li N.
    Arabian Journal of Geosciences, 2021, 14 (15)
  • [5] Risk Assessment on the PPP Financing Project of AHP-based Urban Rail Transit
    Wang Jianbo
    Sheng Xueyan
    Liu Xianning
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 362 - 366
  • [6] Implementation Status and Countermeasures of Urban Domestic Waste Treatment PPP Project in China
    Zhang, Benyue
    Gao, Mingyang
    Sun, Jingjing
    EKOLOJI, 2019, 28 (107): : 427 - 431
  • [7] Research on DSM Project Evaluation Model Based on AHP
    Wang, Li
    Wang, Xiao-duan
    Mi, Qing
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND ENGINEERING, 2015, 17 : 28 - 33
  • [8] Research on multi-agent behavior-driven countermeasures of urban domestic waste treatment PPP project
    Qu, Longyu
    THIRD INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2019, 227
  • [9] Assessing determinants of PPP project performance Applying AHP to urban drinking water sector in India
    Swamy, Raghu Rama D. T. V.
    Tiwari, Piyush
    Sawhney, Anil
    PROPERTY MANAGEMENT, 2018, 36 (01) : 67 - 85
  • [10] Intelligent Performance Evaluation of Urban Subway PPP Project Based on Deep Neural Network Model
    Fan, Weizhi
    Song, Jianmin
    Chen, Lingmin
    Shi, Junjiao
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022