Research on Risk Assessment and Safety Management of Highway Maintenance Project

被引:6
|
作者
Zhao, Jianyou [1 ]
Fu, Xiaoyu [1 ]
Zhang, Yunjiao [1 ]
机构
[1] Changan Univ, Sch Automobile, Xian 710061, Peoples R China
关键词
Highway Maintance; Safety Production; Evaluation Indicator;
D O I
10.1016/j.proeng.2016.01.278
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In order to evaluate the highway maintenance enterprise synthetically and quantificationally, a safety evaluation indicator is established according to the impact conservation production safety factors in this paper. It can help the conservation and management departments to keep abreast of the conservation highway enterprise safety production dynamic and make the targeted safety measures. Lee scale is designed for expert scoring. Analytic hierarchy process is adopted to select it. The indicator weights are ensured by AHP so as to establish highway maintenance safety production comprehensive evaluation system. By verifying the evaluating cases, this method can effectively improve the effectiveness and accuracy of the highway safety production. It has great significance for accelerating highway maintance safety management system. (C) 2016 Published by Elsevier Ltd.
引用
收藏
页码:434 / 441
页数:8
相关论文
共 50 条
  • [1] Safety Risk Assessment of Highway Special Maintenance Project Based on BP Neural Network
    Tian, Wei
    Li, Huimin
    Yan, Ruiqi
    Hu, Yunxiang
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3175 - 3179
  • [2] Rock failure risk assessment in highway maintenance management
    Mouratidis, A.
    Pantelidis, L.
    ADVANCED CHARACTERISATION OF PAVEMENT SOIL ENGINEERING MATERIALS, VOLS 1 AND 2, 2007, : 1145 - 1154
  • [3] Maintenance safety risk management and assessment
    Bryce, J
    THIRD INTERNATIONAL CONFERENCE ON TRAIN MAINTENANCE TOMORROW ... AND BEYOND, 1997, 1997 (01): : 99 - 109
  • [4] Research on Rural Highway Maintenance Management Assessment Methods Based on ANN
    Niu, Jiatang
    2013 SIXTH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL 1, 2013, : 209 - 212
  • [5] Integrated risk management in highway project
    Liu, HuiZhong
    Zheng, MaoLin
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 304 - 306
  • [6] HIGHWAY MAINTENANCE MANAGEMENT RESEARCH-AN OVERVIEW
    RECORDS, WN
    PUBLIC ROADS, 1968, 35 (04) : 102 - &
  • [7] Evaluation of safety management responsibility system for highway maintenance
    Lv, Jina
    Hong, Weiwei
    Ding, Beiyan
    Wang, Yuanqing
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [8] Risk Management in Highway Construction Project Based on Integrated Project Management System
    Jing Bingyin
    Jing Chunju
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
  • [9] Seismic assessment, maintenance and management of Taiwan highway bridges
    Chang, T. L.
    Chen, M. G.
    Wu, H. M.
    Chen, H. C.
    Chang, D. W.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1111 - 1117
  • [10] Study on the highway rockfall safety risk assessment
    Zhang, C. L.
    Tang, S. C.
    Yin, W.
    MODELING AND COMPUTATION IN ENGINEERING II, 2013, : 239 - 244