Shear tests on demountable precast column connections

被引:8
|
作者
Yrjola, Jaakko [1 ]
Bujnak, Jan [1 ]
机构
[1] Peikko Grp, Dept R&D Connect, Voimakatu 3, Lahti 15170, Finland
关键词
bolted connections; dismount ability; precast concrete element; reusability; shear‐ transfer;
D O I
10.1002/suco.202000635
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Lately, there has been increasing demand for structural solutions and building technologies with minimalized CO2 footprint. One way to approach the carbon neutrality is through reuse of structural components. In order to enable economic reuse of precast concrete elements, their connections must be designed to allow an effortless dismount. While dismount ability provides additional value to the structure, it cannot have a negative impact on other crucial properties of the connection. One of those properties is the load-transfer capacity. While the impact of improved demountability on the load-transfer of axial forces is negligible, the capacity of such joints to transfer shear forces can be questioned, as it is often assumed to rely on the friction generated along compressed section. This paper studies the effects of an improvement of demountability on the shear-transfer system in a bolted joint of precast concrete columns.
引用
收藏
页码:2432 / 2442
页数:11
相关论文
共 50 条
  • [1] Shear transfer in bolted precast concrete column connections
    Yrjola, Jaakko
    Bujnak, Jan
    PCI JOURNAL, 2024, 69 (01): : 58 - 72
  • [2] Seismic tests of beam-to-column connections in a precast concrete frame
    Alcocer, SM
    Carranza, R
    Perez-Navarrete, D
    Martinez, R
    PCI JOURNAL, 2002, 47 (03): : 70 - +
  • [3] Experimental tests of precast reinforced concrete beam-column connections
    Guerrero, Hector
    Rodriguez, Vladimir
    Alberto Escobar, J.
    Alcocer, Sergio M.
    Bennetts, Felipe
    Suarez, Manuel
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2019, 125
  • [4] Experimental investigation into demountable dry connections for fully precast frame structures through shaking table tests
    Zhang, Ruijun
    Guo, Tong
    Li, Aiqun
    THIN-WALLED STRUCTURES, 2024, 201
  • [5] Behaviour and design of demountable steel column-column connections
    Li, Dongxu
    Uy, Brian
    Patel, Vipul
    Aslani, Farhad
    STEEL AND COMPOSITE STRUCTURES, 2016, 22 (02): : 429 - 448
  • [6] Load transfer mechanism of precast concrete piers with demountable connections
    Zhou, Qiang
    Liu, Yuqing
    Li, Yongjun
    ENGINEERING STRUCTURES, 2022, 261
  • [7] Cyclic shear tests on RC precast beam-to-column connections retrofitted with a three-hinged steel device
    Gennaro Magliulo
    Maddalena Cimmino
    Marianna Ercolino
    Gaetano Manfredi
    Bulletin of Earthquake Engineering, 2017, 15 : 3797 - 3817
  • [8] Cyclic shear tests on RC precast beam-to-column connections retrofitted with a three-hinged steel device
    Magliulo, Gennaro
    Cimmino, Maddalena
    Ercolino, Marianna
    Manfredi, Gaetano
    BULLETIN OF EARTHQUAKE ENGINEERING, 2017, 15 (09) : 3797 - 3817
  • [9] Tests on precast concrete frames with connections constructed away from column faces
    Khoo, JH
    Li, B
    Yip, WK
    ACI STRUCTURAL JOURNAL, 2006, 103 (01) : 18 - 27
  • [10] TESTS ON SLAB-COLUMN CONNECTIONS WITH SHEAR AND UNBALANCED FLEXURE
    ISLAM, S
    PARK, R
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1977, 103 (09): : 1888 - 1889