Scientific problems and research proposals for Sichuan-Tibet railway tunnel construction

被引:94
|
作者
Zhang, Dingli [1 ,2 ]
Sun, Zhenyu [2 ]
Fang, Qian [2 ]
机构
[1] Beijing Jiaotong Univ, Sichuan Tibet Railway Res Inst, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Key Lab Urban Underground Engn, Minist Educ, Beijing 100044, Peoples R China
基金
国家重点研发计划;
关键词
Sichuan-Tibet railway tunnels; Key scientific problems; Complex stress environment; Deformation mechanism of surrounding rock; Dynamic response; CONVERGENCE-CONFINEMENT METHOD; GROUND RESPONSE CURVES; SURROUNDING ROCK; RISK-ASSESSMENT; WATER INRUSH; SOFT ROCK; DEFORMATION MECHANISM; STRESS MEASUREMENTS; CIRCULAR OPENINGS; NONLINEAR MODEL;
D O I
10.1016/j.undsp.2021.10.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Sichuan???Tibet railway construction has received significant attention from both China and abroad. The new section from Ya???an to Nyingchi is about 1018.6 km long, including 69 tunnels with a total length of 841.7 km. The longest tunnel (Yigong tunnel) is 42.4 km long. The successful construction of the Sichuan???Tibet railway depends largely on tunnel construction. Due to the complex conditions, tunnel construction for the Sichuan???Tibet railway poses great challenges to the research community. This paper aims to illustrate the necessity of interdisciplinary and joint research to solve problems associated with tunnel construction that will be encountered in the immediate future and facilitate the communication and exchange of ideas between disciplines. To this end, based on a systematic analysis of the available data related to Sichuan???Tibet railway tunnels, six major aspects of the geology, environment, and engineering conditions are identified. Next, based on the engineering responses from the Sichuan???Tibet railway tunnels, potential technical problems and risk characteristics are predicted and evaluated. Further, six key scientific issues are identified and discussed based on a coupled multi-layer analysis of essential tunnel engineering issues. Finally, research directions, technical ideas, and research methods that should be carried out for this project are proposed.
引用
收藏
页码:419 / 439
页数:21
相关论文
共 50 条
  • [1] Countermeasure Research on Sichuan-Tibet Railway Construction Based on Safety Risk Assessment
    Zhang Jin
    Xu Junxiang
    2019 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION ENGINEERING (ICITE 2019), 2019, : 54 - 58
  • [2] Scientific challenges in disaster risk reduction for the Sichuan-Tibet Railway
    Cui, Peng
    Ge, Yonggang
    Li, Shaojun
    Li, Zhenhong
    Xu, Xiwei
    Zhou, Gordon G. D.
    Chen, Huayong
    Wang, Hao
    Lei, Yu
    Zhou, Libo
    Yi, Shujian
    Wu, Chunhao
    Guo, Jian
    Wang, Qi
    Lan, Hengxing
    Ding, Mingtao
    Ren, Junjie
    Zeng, Lu
    Jiang, Yuanjun
    Wang, Yan
    ENGINEERING GEOLOGY, 2022, 309
  • [3] Research on the Rock Burst Prediction of a Tunnel in Sichuan-Tibet Railway Based on Microseismic Monitoring
    Han, Kan
    Chen, Xianfeng
    Yang, Wenbin
    Wang, Bingyong
    Journal of Railway Engineering Society, 2020, 37 (11) : 90 - 95
  • [4] Geothermal anomalies in the Xianshuihe area: Implications for tunnel construction along the Sichuan-Tibet Railway, China
    Liu, Feng
    Zhang, Wei
    Wang, Gui-ling
    Wei, Shuai-chao
    Yue, Chen
    Jiang, Guang-zheng
    Liao, Yu-zhong
    JOURNAL OF GROUNDWATER SCIENCE AND ENGINEERING, 2023, 11 (03): : 237 - 248
  • [5] Application of Airborne Electromagnetic Method in Tunnel Exploration in Sichuan-Tibet Railway
    Li, Jian
    Journal of Railway Engineering Society, 2020, 37 (04) : 1 - 5
  • [6] Challenges and Countermeasures for Construction Safety during the Sichuan-Tibet Railway Project
    Lu, Chunfang
    Cai, Chaoxun
    ENGINEERING, 2019, 5 (05) : 833 - 838
  • [7] Reliability guarantee framework for the Sichuan-Tibet Railway
    Lu, Chunfang
    Pan, Yongjie
    Cai, Chaoxun
    FRONTIERS OF ENGINEERING MANAGEMENT, 2021, 8 (04) : 480 - 491
  • [8] Challenges to engineering geology of Sichuan-Tibet railway
    Peng J.
    Cui P.
    Zhuang J.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2020, 39 (12): : 2377 - 2389
  • [9] Cooling Technology and Effect Analysis for High Geothermal Tunnel on Sichuan-Tibet Railway
    Yan J.
    He C.
    Zeng Y.
    Wang B.
    Zhang J.
    Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (05): : 53 - 62
  • [10] Reliability guarantee framework for the Sichuan-Tibet Railway
    Chunfang Lu
    Yongjie Pan
    Chaoxun Cai
    Frontiers of Engineering Management, 2021, 8 : 480 - 491