Maximized detention volume determined by runoff capture ratio

被引:62
|
作者
Guo, JCY [1 ]
Urbonas, B [1 ]
机构
[1] URBAN DRAIN & FLOOD CONTROL DIST,DENVER,CO 80211
关键词
D O I
10.1061/(ASCE)0733-9496(1996)122:1(33)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The percentage of storm-water runoff volume, or of the number of runoff events captured is a key factor when designing storm-water quality control facilities. Design criteria originally developed for sizing flood control detention are not appropriate for sizing detention for storm-water quality control. This paper presents a simple technique that can be used to estimate the needed storm-water detention volume of structural water quality best-management facilities. This volume is based on the point where diminishing returns begin to occur in either the long-term runoff volume capture and treatment or in the number of runoff events captured and treated. This volume is defined as the ''maximized'' volume. The procedure presented is intended for preliminary planning or design when detailed local investigations have not been performed. It is not intended to replace detailed, site-specific investigations. Its accuracy, however, was verified by comparing its results against similar findings that emerged from several detailed local investigations.
引用
收藏
页码:33 / 39
页数:7
相关论文
共 50 条
  • [1] Discussion about initial runoff and volume capture ratio of annual rainfall
    Zhang, Kun
    Che, Wu
    Zhang, Wei
    Zhao, Yang
    WATER SCIENCE AND TECHNOLOGY, 2016, 74 (08) : 1764 - 1772
  • [2] RUNOFF DETENTION FOR FLOOD VOLUME OR EROSION CONTROL
    AKAN, AO
    ANTOUN, EN
    JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 1994, 120 (01) : 168 - 178
  • [3] Optimal Camera Placement for Maximized Motion Capture Volume and Marker Visibility
    Ziegler, Jakob
    Gattringer, Hubert
    Muller, Andreas
    ADVANCES IN SERVICE AND INDUSTRIAL ROBOTICS, RAAD 2023, 2023, 135 : 45 - 52
  • [4] Stormwater Quality Capture Volume for Mitigating Urban Runoff Impacts
    Guo, James C. Y.
    Urbonas, Ben
    JOURNAL OF HYDROLOGIC ENGINEERING, 2021, 26 (05)
  • [5] STORM RUNOFF DETENTION FOR POLLUTANT REMOVAL
    AKAN, AO
    JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1992, 118 (03): : 380 - 389
  • [6] The Response of Runoff Pollution Control to Initial Runoff Volume Capture in Sponge City Construction Using SWMM
    Si, Shuai
    Li, Junqi
    Jiang, Yucheng
    Wang, Yuzhen
    Liu, Lian
    APPLIED SCIENCES-BASEL, 2022, 12 (11):
  • [7] Evaluation of a first-flush capture and detention tank receiving runoff from an asphalt-paved road
    Cheng, Jing
    Yuan, Qingke
    Youngchul, Kim
    WATER AND ENVIRONMENT JOURNAL, 2017, 31 (03) : 410 - 417
  • [8] STORM RUNOFF DETENTION FOR POLLUTANT REMOVAL - CLOSURE
    AKAN, AO
    JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1993, 119 (06): : 1257 - 1258
  • [9] STORM RUNOFF DETENTION FOR POLLUTANT REMOVAL - DISCUSSION
    KELLY, M
    JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1993, 119 (06): : 1255 - 1257
  • [10] Formation and capture of droplet with high volume ratio of cell to droplet
    Zhao, Zhi
    Xun, Zhen-Yu
    Fan, Liang-Liang
    Zhe, Jiang
    Zhao, Liang
    JOURNAL OF MICROMECHANICS AND MICROENGINEERING, 2021, 31 (08)