Implications of selected production planning functions: impact analysis through simulation

被引:2
|
作者
Hasin, MAA
Thuy, NT
Shareef, MA
机构
[1] Asian Inst Technol, Ind Syst Engn Program, Comp Integrated Mfg Lab, Klongluang 12120, Pathumthani, Thailand
[2] Trade Dev Co, Dhaka, Bangladesh
关键词
production planning; capacity planning; lead time; scrap;
D O I
10.1080/095372800432106
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
When capacity differences are minimized through an efficient algorithm, and integration of capacity planning with any production planning system is performed, it affects some elements of production planning functions. In the reverse way, some elements of production planning and management techniques also affect the effectiveness of capacity planning. These happen because capacity planning processes, production planning processes and production management techniques are not standalone sub-systems, rather these are totally dependent on each other. This paper aims at determining and formulating the effects of some of the selected elements of capacity and production planning functions on each other. This study is conducted using simulation in object-oriented SIMPLE++ system.
引用
收藏
页码:641 / 647
页数:7
相关论文
共 50 条