Application of RIAM to the environmental impact assessment of hydroelectric installations

被引:0
|
作者
De Araujo, Paulo S. F. [1 ]
Haie, Naim [1 ]
机构
[1] Univ Minho, Dept Civil Engn, P-4800058 Guimaraes, Portugal
关键词
Coa river; environmental impact assessment; RIAM;
D O I
暂无
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
This paper evaluates an Environmental Impact Assessment (EIA) using the Rapid Impact Assessment Matrix (RIAM). It analyses and presents the numerous parameters and alternatives of an EIA in a structured, friendly and transparent environment. It considers all four components: physical/chemical, biological/ecological, social/cultural, economic/operational. These are then evaluated using universal criteria common to all impact consideration. Figures and tables made comparisons much easier. This Matrix was applied to the EIA of the future Vale de Madeira Hydroelectric Installation that will be situated on the River Coa of the Douro River basin in the Municipalities of Pinhel and Figueira de Castelo Rodrigo, north of Portugal. It will be shown that such a project will be positive economically, but otherwise negative (as related to the other three components evaluated in RIAM).
引用
收藏
页码:320 / +
页数:2
相关论文
共 50 条
  • [1] Environmental impact assessment using rapid impact assessment matrix (RIAM) for Russeifa landfill, Jordan
    El-Naqa, A
    ENVIRONMENTAL GEOLOGY, 2005, 47 (05): : 632 - 639
  • [2] The environmental impact assessment of mini hydroelectric power plants
    Utrera Caro, Sebastian Felix
    ACTUALIDAD JURIDICA AMBIENTAL, 2020, (102): : 788 - 798
  • [3] Hydroelectric plants environmental viability: Strategic environmental assessment application in Brazil
    Andrade, Andre de Lima
    dos Santos, Marco Aurelio
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 52 : 1413 - 1423
  • [4] Application of rapid impact assessment matrix (RIAM) method for waste disposal site
    Baba, A.
    Managing Critical Infrastructure Risks: Decision Tools and Application for Port Security, 2007, : 471 - 481
  • [5] Resolving issues with environmental impact assessment of marine renewable energy installations
    Maclean, Ilya M. D.
    Inger, Richard
    Benson, David
    Booth, Cormac G.
    Embling, Clare B.
    Grecian, W. James
    Heymans, Johanna J.
    Plummer, Kate E.
    Shackshaft, Michael
    Sparling, Carol E.
    Wilson, Ben
    Wright, Lucy J.
    Bradbury, Gareth
    Christen, Nadja
    Godley, Brendan J.
    Jackson, Angus C.
    McCluskie, Aly
    Nicholls-Lee, Rachel
    Bearhop, Stuart
    FRONTIERS IN MARINE SCIENCE, 2014, 1
  • [6] Environmental Impact Assessment of Liquid Waste Ponds in Uranium Milling Installations
    C. P. Naveira-Cotta
    E. M. Pontedeiro
    R. M. Cotta
    J. Su
    M. T. van Genuchten
    Waste and Biomass Valorization, 2013, 4 : 197 - 211
  • [7] Environmental Impact Assessment of Liquid Waste Ponds in Uranium Milling Installations
    Naveira-Cotta, C. P.
    Pontedeiro, E. M.
    Cotta, R. M.
    Su, J.
    van Genuchten, M. T.
    WASTE AND BIOMASS VALORIZATION, 2013, 4 (02) : 197 - 211
  • [8] Developing the RIAM method (rapid impact assessment matrix) in the context of impact significance assessment
    Ijas, Asko
    Kuitunen, Markku T.
    Jalava, Kimmo
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2010, 30 (02) : 82 - 89
  • [9] Environmental impact assessment of structural flood mitigation measures by a rapid impact assessment matrix (RIAM) technique: A case study in Metro Manila, Philippines
    Gilbuena, Romeo, Jr.
    Kawamura, Akira
    Medina, Reynaldo
    Amaguchi, Hideo
    Nakagawa, Naoko
    Duong Du Bui
    SCIENCE OF THE TOTAL ENVIRONMENT, 2013, 456 : 137 - 147
  • [10] ENVIRONMENTAL IMPACT ASSESSMENT OF MUNICIPAL SOLID WASTE DISPOSAL SITE USING RAPID IMPACT ASSESSMENT MATRIX (RIAM) ANALYSIS IN MASHHAD CITY, IRAN
    Aliakbari-Beidokhti, Zohreh
    Ghazizade, Mahdi Jalili
    Gholamalifard, Mehdi
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2017, 16 (10): : 2361 - 2369