Application of optimization techniques to parameter set-up in scheduling

被引:3
|
作者
Talbi, ED
Geneste, L
Grabot, B
Prévitali, R
Hostachy, P
机构
[1] ENIT, LGP, F-65016 Tarbes, France
[2] Finmat France, Le Sextant, F-69731 Caluire Cuire, France
关键词
schedule; meta-heuristics; black box optimization;
D O I
10.1016/j.compind.2004.07.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Scheduling requires to set-up a number of parameters that have a direct influence on the schedule quality. Since scheduling is a highly unstable process, it is usually a long and complex task to tune manually these parameters in order to optimize a set of objectives. Meta-heuristics have recently been successfully used for schedule optimization, but an important modeling effort is usually required in order to express the problem to solve within the specific framework of each method. Moreover, these techniques are often time-consuming and their application to problems of industrial size may be hazardous. It is suggested in this article a way to combine meta-heuristics in a black box approach in order to select, then set-up scheduling parameters on industrial-scale scheduling problems, i.e. problems where several tens of criteria can be combined in order to build an objective function, several tens of parameters can be used, with a schedule involving several hundreds of machines and several thousands of tasks. An implementation framework has been developed and tested on an industrial scheduler, named Ortems(R). The first results of the use of this framework on real industrial databases are described and commented. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:105 / 124
页数:20
相关论文
共 50 条
  • [1] Optimal set-up of industrial scheduling software
    Talbi, D
    Geneste, L
    Grabot, B
    Prévitali, R
    Hostachy, P
    COLLABORATIVE SYSTEMS FOR PRODUCTION MANAGEMENT, 2003, 129 : 561 - 572
  • [2] Scheduling in Switching Networks with Set-Up Delays
    Foto Afrati
    Timos Aslanidis
    Evripidis Bampis
    Ioannis Milis
    Journal of Combinatorial Optimization, 2005, 9 : 49 - 57
  • [3] Scheduling in switching networks with set-up delays
    Afrati, F
    Aslanidis, T
    Bampis, E
    Milis, I
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2005, 9 (01) : 49 - 57
  • [4] A HEURISTIC FOR PREEMPTIVE SCHEDULING WITH SET-UP TIMES
    WOGINGER, GJ
    YU, Z
    COMPUTING, 1992, 49 (02) : 151 - 158
  • [5] Scheduling with product family set-up times: an application in TFT LCD manufacturing
    Shin, HJ
    Leon, VJ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (20) : 4235 - 4248
  • [6] Validation of Scheduling Techniques to Reduce Peak Temperature on an Architectural Level Platform Set-up
    Chaturvedi, Vivek
    Thanarungroj, Pollawat
    Liu, Chen
    Quan, Gang
    IEEE SOUTHEASTCON 2011: BUILDING GLOBAL ENGINEERS, 2011, : 111 - 116
  • [7] Scheduling with shutdowns and sequence dependent set-up times
    Department of Industrial Engineering, College of Engineering, Osaka Prefecture University, Gakuencho, Sakai, Osaka, 599-8531, Japan
    Int J Prod Res, 7 (1661-1676):
  • [8] Scheduling with shutdowns and sequence dependent set-up times
    Asano, M
    Ohta, H
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (07) : 1661 - 1676
  • [9] STOCHASTIC SCHEDULING OF PARALLEL QUEUES WITH SET-UP COSTS
    DUENYAS, I
    VANOYEN, MP
    QUEUEING SYSTEMS, 1995, 19 (04) : 421 - 444
  • [10] Metaheuristics for the optimization of Terrestrial LiDAR set-up
    Lopez, Alfonso
    Ogayar, Carlos J.
    Jurado, Juan M.
    Feito, Francisco R.
    AUTOMATION IN CONSTRUCTION, 2023, 146