摘要
This paper critically evaluates the operational perspective of Virtual Power Plants (VPP) in Germany by analyzing key factors to replace conventional power plants in the future power system. Therefore, its necessity for the secure operation as well as the technical and economic benefits for the German power system are pointed out. The single sections describe in detail how the requirements on technical functions and standardized communication can be reconciled with the increasing challenges on volatile generation. Furthermore, a new sensitivity calculation concept based on accounting areas and under consideration of VPP are presented. Based on that, different operation concepts are assessed with respect to their mathematical algorithms and their practical feasibility under consideration of given circumstances and future developments.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Technical Integration of Virtual Power Plants enhanced by Energy Storages into German System Operation with regard to Following the Schedule in Intra-Day
    Ziegler, Christian
    Richter, Andre
    Hauer, Ines
    Wolter, Martin
    2018 53RD INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE (UPEC), 2018,
  • [2] Research on optimal operation and bidding strategy of power system with virtual power plants
    Ai X.
    Zhou S.
    Zhao Y.
    1600, Chinese Society for Electrical Engineering (36): : 6351 - 6362
  • [3] Market Integration of Virtual Power Plants
    Petersen, M. K.
    Hansen, L. H.
    Bendtsen, J.
    Edlund, K.
    Stoustrup, J.
    2013 IEEE 52ND ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2013, : 2319 - 2325
  • [4] Optimal stochastic operation of technical virtual power plants in reconfigurable distribution networks considering contingencies
    Aghdam, Farid Hamzeh
    Javadi, Mohammad Sadegh
    Catalao, Joao P. S.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2023, 147
  • [5] Integration of vertical solar power plants into a future German energy system
    Reker, Sophia
    Schneider, Jens
    Gerhards, Christoph
    SMART ENERGY, 2022, 7
  • [6] A Decision Support System for the Strategic Operation of Virtual Power Plants in Electricity Markets
    Pepiciello, Antonio
    Bernardo, Giovanna
    D'Argenzio, Emanuele
    Vaccaro, Alfredo
    7TH INTERNATIONAL CONFERENCE ON CLEAN ELECTRICAL POWER (ICCEP 2019): RENEWABLE ENERGY RESOURCES IMPACT, 2019, : 370 - 374
  • [7] Technical, economical and regulatory aspects of virtual power plants
    Werner, T. G.
    Remberg, R.
    2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 2427 - 2433
  • [8] Individual Customers' Influence on the Operation of Virtual Power Plants
    Buchholz, Britta
    Nestle, David
    Kiessling, Andreas
    2009 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-8, 2009, : 1921 - +
  • [9] Integration of DER into power system operation through Virtual Power Plant concept applied for voltage regulation
    Oyarzabal, Jose
    Marti, Juan
    Ilo, Albana
    Sebastian, Maria
    Alvira, David
    Johansen, Knud
    2009 CIGRE/IEEE PES JOINT SYMPOSIUM INTEGRATION OF WIDE-SCALE RENEWABLE RESOURCES INTO THE POWER DELIVERY SYSTEM, 2009, : 302 - 308
  • [10] ISBA, a technical information system for the construction, operation, service and ageing management of nuclear power plants
    Schillberg, H
    Drozella, H
    PRODUCT AND PROCESS MODELLING IN BUILDING AND CONSTRUCTION, 2000, : 55 - 60