Issues on short-term scheduling of oil refinery

被引:4
|
作者
Naiqi Wu [1 ]
Yanming Qian [1 ]
MengChu Zhou [2 ]
Feng Chu [3 ]
机构
[1] Guangdong Univ Technol, Sch Mechatron Engn, Dept Ind Engn, Guangzhou 510090, Guangdong, Peoples R China
[2] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
[3] Univ Technol Troyes, Inst Charles Delaunay, FRE CNRS 2848, Lab Doptimisation & Syst Ind, F-10010 Troyes, France
关键词
D O I
10.1109/ICSMC.2006.384561
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In practice, the short-term scheduling job of oil refinery processes is still done manually by planners, because of the lack of such tools. This paper briefly reviews the theoretic research advancement in this field. It shows that although some progress has been made, the techniques obtained are not applicable in practice. Thus, the future research trends in this field should focus on methods that can bridge the gap between theory and applications. Based on the review, this paper concludes that it may be helpful if the problem is studied in a viewpoint of control theory and hence, solved by combining enumeration and heuristic instead of using mathematical programming formulations.
引用
收藏
页码:2920 / +
页数:2
相关论文
共 50 条
  • [1] Short-Term Scheduling of Refinery Crude Oil Operations
    Yadav, Sanjeev
    Shaik, Munawar A.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2012, 51 (27) : 9287 - 9299
  • [2] Modeling and Optimization for Short-Term Scheduling of Crude Oil Operations in Refinery
    Hou, Yan
    Wu, NaiQi
    2015 IEEE 12th International Conference on Networking, Sensing and Control (ICNSC), 2015, : 264 - 270
  • [3] A genetic algorithm approach to short-term scheduling of crude oil operations in refinery
    Hou, Yan
    Wu, NaiQi
    Li, ZhiWu
    IEEJ TRANSACTIONS ON ELECTRICAL AND ELECTRONIC ENGINEERING, 2016, 11 (05) : 593 - 603
  • [4] Optimisation-based algorithm for refinery short-term scheduling of crude-oil
    Duan, Qianqian
    Yang, Genke
    Li, Guoqiang
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2018, 17 (01) : 34 - 59
  • [5] Chance constrained programming models for refinery short-term crude oil scheduling problem
    Cao, Cuiwen
    Gu, Xingsheng
    Xin, Zhong
    APPLIED MATHEMATICAL MODELLING, 2009, 33 (03) : 1696 - 1707
  • [6] Refinery short-term scheduling using continuous time formulation: Crude-oil operations
    Jia, ZY
    Ierapetritou, M
    Kelly, JD
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (13) : 3085 - 3097
  • [7] On convexity issues of short-term hydrothermal scheduling
    Yu, Z
    Sparrow, FT
    Bowen, B
    Smardo, FJ
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2000, 22 (06) : 451 - 457
  • [8] Short-Term Scheduling of a Large-Scale Oil-Refinery Operations: Incorporating Logistics Details
    Shah, Nikisha K.
    Ierapetritou, Marianthi G.
    AICHE JOURNAL, 2011, 57 (06) : 1570 - 1584
  • [9] Short-term scheduling of crude oil operations in refinery with high-fusion-point oil and two transportation pipelines
    Wu, NaiQi
    Zhu, MengChu
    Bai, LiPing
    Li, ZhiWu
    ENTERPRISE INFORMATION SYSTEMS, 2016, 10 (06) : 581 - 610
  • [10] Short-term scheduling of refinery operations from unloading crudes to distillation
    Reddy, PCP
    Karimi, IA
    Srinivasan, R
    PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 304 - 309